IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

6,403

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
ME0186 # 09 Y:1996 09 1996 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $1,102 $0 Implemented
ME0186 # 10 Y:1996 10 1996 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $1,019 $2,220 Not Implemented
ME0186 # 11 Y:1996 11 1996 INSULATE BARE EQUIPMENT $861 $686 Not Implemented
ME0186 # 12 Y:1996 12 1996 USE AUTOMATIC FLOW CONTROL $10,090 $4,100 Implemented
UF0146 # 01 Y:1996 01 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,979 $8,198 Implemented
UF0146 # 02 Y:1996 02 1996 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $13,032 $1,050 Implemented
UF0146 # 03 Y:1996 03 1996 INSTALL HEAT PIPES / RAISE COOLING SETPOINT $57,061 $80,000 Implemented
UF0146 # 04 Y:1996 04 1996 INSTALL OCCUPANCY SENSORS $2,637 $640 Not Implemented
UF0146 # 05 Y:1996 05 1996 REDUCE DELIVERY SCHEDULES $3,070 $0 Not Implemented
UF0146 # 06 Y:1996 06 1996 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,410 $3,332 Implemented
UF0146 # 07 Y:1996 07 1996 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,583 $4,715 Not Implemented
SD0146 # 01 Y:1996 01 1996 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $857 $150 Implemented
SD0146 # 02 Y:1996 02 1996 INSULATE BARE EQUIPMENT $530 $659 Implemented
SD0146 # 03 Y:1996 03 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $515 $564 Implemented
SD0146 # 04 Y:1996 04 1996 INSTALL SPECTRAL REFLECTORS / DELAMP $373 $710 Implemented
SD0146 # 05 Y:1996 05 1996 INSTALL OCCUPANCY SENSORS $595 $394 Implemented
SD0146 # 06 Y:1996 06 1996 REDUCE SOLUTION DRAG-OUT TO PREVENT SOLUTION LOSS $26,498 $0 Implemented
UD0487 # 01 Y:1996 01 1996 OPTIMIZE PLANT POWER FACTOR $1,502 $4,000 Not Implemented
UD0487 # 02 Y:1996 02 1996 USE DEMAND CONTROLLER OR LOAD SHEDDER $13,369 $500 Not Implemented
UD0487 # 03 Y:1996 03 1996 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $33,600 $0 Not Implemented
UD0487 # 04 Y:1996 04 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $956 $3,035 Not Implemented
UD0487 # 05 Y:1996 05 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,168 $3,450 Not Implemented
UD0487 # 06 Y:1996 06 1996 RECYCLE CASTING SAND $10,179 $15,000 Not Implemented
UM0050 # 01 Y:1996 01 1996 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,113 $250 Implemented
UM0050 # 02 Y:1996 02 1996 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,277 $0 Not Implemented