Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Dayton |
---|---|
Assessment Year | 1996 |
Principal Product | Large Aluminum casted components |
NAICS | n/a |
SIC | 3363 - Aluminum Die-castings |
Sales | $1,000,000-$5,000,000 |
# of Employees | 50 |
Plant Area (Sq.Ft.) | 97,000 |
Annual Production | 500 Tons |
Production Hrs. Annual | 5,000 |
Location (State) | OH |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $50,210 | 1,569,461 | kWh | $0.03 |
Electricity Demand | $70,190 | 5,796 | kW-months/year | $12.11 |
Natural Gas | $12,466 | 5,303 | MMBtu | $2.35 |
TOTAL ENERGY COSTS | $144,626 | |||
RECOMMENDED SAVINGS* | $61,774 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | - |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Electricity Fees | Solid Waste (non-haz) | Personnel Changes | Electricity Usage | Electricity Demand | Electricity Fees | Solid Waste (non-haz) | Personnel Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | $ | $ | lb | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.3212 OPTIMIZE PLANT POWER FACTOR |
Savings: $1,502 Cost: $4,000 |
- | - | $1,502 | 124 | - | - | - | - | - | - |
- - kWh |
$1,502 124 kW-months/year |
- - $ |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.3191 USE DEMAND CONTROLLER OR LOAD SHEDDER |
Savings: $13,369 Cost: $500 |
- | - | $13,369 | 1,104 | - | - | - | - | - | - |
- - kWh |
$13,369 1,104 kW-months/year |
- - $ |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS |
Savings: $33,600 Cost: - |
- | - | $32,400 | 2,676 | $1,200 | - | - | - | - | - |
- - kWh |
$32,400 2,676 kW-months/year |
$1,200 - $ |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $956 Cost: $3,035 |
$425 | 13,189 | $531 | 44 | - | - | - | - | - | - |
$425 13,189 kWh |
$531 44 kW-months/year |
- - $ |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $2,168 Cost: $3,450 |
$1,015 | 32,825 | $1,003 | 83 | - | - | - | - | $150 | - |
$1,015 32,825 kWh |
$1,003 83 kW-months/year |
- - $ |
- - lb |
$150 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 3.5221 RECYCLE CASTING SAND |
Savings: $10,179 Cost: $15,000 |
$(-128) | (-4,103) | $(-1,453) | (-120) | - | - | $11,760 | 1,960,000 | - | - |
$(-128) (-4,103) kWh |
$(-1,453) (-120) kW-months/year |
- - $ |
$11,760 1,960,000 lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $61,774 Cost: $25,985 |
$1,312 | 41,911 | $47,352 | 3,911 | $1,200 | - | $11,760 | 1,960,000 | $150 | - | $1,312 41,911 kWh |
$47,352 3,911 kW-months/year |
$1,200 - $ |
$11,760 1,960,000 lb |
$150 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: - Cost: - |
- | - | - | - | - | - | - | - | - | - | - - kWh |
- - kW-months/year |
- - $ |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | $ | $ | lb | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Electricity Fees | Solid Waste (non-haz) | Personnel Changes | Electricity Usage | Electricity Demand | Electricity Fees | Solid Waste (non-haz) | Personnel Changes |