IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

50,367

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NC0471 # 02 Y:2012 02 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $90,894 $148,184 Implemented
NC0471 # 03 Y:2012 03 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,310 $2,810 Implemented
NC0471 # 04 Y:2012 04 2012 INSTALL OCCUPANCY SENSORS $17,141 $6,600 Implemented
NC0471 # 05 Y:2012 05 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,566 $100 Implemented
NC0471 # 06 Y:2012 06 2012 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $121,439 $199,600 Not Implemented
NC0471 # 07 Y:2012 07 2012 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $5,568 $2,700 Implemented
NC0471 # 08 Y:2012 08 2012 INCREASE AMOUNT OF CONDENSATE RETURNED $22,095 $21,000 Implemented
NC0471 # 09 Y:2012 09 2012 REPAIR OR REPLACE STEAM TRAPS $19,533 $16,000 Implemented
NC0471 # 10 Y:2012 10 2012 CHANGE ZONE REHEAT COILS TO VARIABLE AIR VOLUME BOXES $63,854 $140,000 Not Implemented
NC0467 # 01 Y:2012 01 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $146 $652 Implemented
NC0467 # 02 Y:2012 02 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $290 $1,265 Not Implemented
NC0467 # 03 Y:2012 03 2012 INSTALL SPECTRAL REFLECTORS / DELAMP $3,485 $18,400 Not Implemented
NC0467 # 04 Y:2012 04 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,208 $1,180 Implemented
NC0467 # 05 Y:2012 05 2012 INSTALL OCCUPANCY SENSORS $448 $525 Implemented
NC0467 # 06 Y:2012 06 2012 RECOVER WASTE HEAT FROM EQUIPMENT $347 $1,200 Not Implemented
NC0467 # 07 Y:2012 07 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $245 $100 Implemented
NC0467 # 08 Y:2012 08 2012 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $459 $300 Implemented
NC0467 # 09 Y:2012 09 2012 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $34,729 $15,000 Implemented
MI0230 # 01 Y:2012 01 2012 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $185,551 $480 Implemented
MI0230 # 02 Y:2012 02 2012 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $146,160 $70,200 Not Implemented
MI0230 # 03 Y:2012 03 2012 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $88,716 $46,097 Implemented
MI0230 # 04 Y:2012 04 2012 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $64,249 $12,488 Not Implemented
MI0230 # 05 Y:2012 05 2012 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $45,101 $41,600 Implemented
MI0230 # 06 Y:2012 06 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $17,707 $1,660 Implemented
MI0230 # 07 Y:2012 07 2012 INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE $15,150 $4,720 Not Implemented