Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
1,004
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
DL0085 # 05 Y:2012 | 05 | 2012 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $32,910 | $51,500 | Implemented |
DL0085 # 06 Y:2012 | 06 | 2012 | RECOVER WASTE HEAT FROM EQUIPMENT | $7,995 | $4,850 | Implemented |
DL0085 # 07 Y:2012 | 07 | 2012 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $4,020 | $2,800 | Implemented |
DL0085 # 08 Y:2012 | 08 | 2012 | INSTALL OCCUPANCY SENSORS | $2,640 | $620 | Implemented |
DL0085 # 09 Y:2012 | 09 | 2012 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $23,794 | $80,000 | Not Implemented |
DL0085 # 10 Y:2012 | 10 | 2012 | REVISE SMOKE CLEANUP FROM OPERATIONS | $3,290 | $11,200 | Implemented |
DL0085 # 11 Y:2012 | 11 | 2012 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $5,894 | $11,040 | Not Implemented |
DL0085 # 12 Y:2012 | 12 | 2012 | TURN OFF EQUIPMENT WHEN NOT IN USE | $1,010 | $500 | Not Implemented |
DL0084 # 01 Y:2012 | 01 | 2012 | ADJUST BURNERS FOR EFFICIENT OPERATION | $1,825 | $500 | Implemented |
DL0084 # 02 Y:2012 | 02 | 2012 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $8,216 | $35,000 | Not Implemented |
DL0084 # 03 Y:2012 | 03 | 2012 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $6,919 | $20 | Not Implemented |
DL0084 # 04 Y:2012 | 04 | 2012 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,252 | $20 | Not Implemented |
DL0083 # 01 Y:2012 | 01 | 2012 | TURN OFF EQUIPMENT WHEN NOT IN USE | $10,690 | $3,000 | Not Implemented |
DL0083 # 02 Y:2012 | 02 | 2012 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,150 | $100 | Not Implemented |
DL0083 # 03 Y:2012 | 03 | 2012 | TURN OFF EQUIPMENT WHEN NOT IN USE | $9,950 | $100 | Implemented |
DL0083 # 04 Y:2012 | 04 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,960 | $5,400 | Implemented |
DL0083 # 05 Y:2012 | 05 | 2012 | RECOVER WASTE HEAT FROM EQUIPMENT | $465 | $2,100 | Not Implemented |
DL0083 # 06 Y:2012 | 06 | 2012 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $18,920 | $4,750 | Implemented |
DL0083 # 07 Y:2012 | 07 | 2012 | USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT | $12,480 | $2,500 | Not Implemented |
DL0083 # 08 Y:2012 | 08 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,964 | $28,300 | Not Implemented |
DL0083 # 09 Y:2012 | 09 | 2012 | MAINTAIN AIR FILTERS BY CLEANING OR REPLACEMENT | $1,190 | $150 | Not Implemented |
DL0083 # 10 Y:2012 | 10 | 2012 | TURN OFF EQUIPMENT WHEN NOT IN USE | $1,050 | $100 | Implemented |
DL0083 # 11 Y:2012 | 11 | 2012 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $600 | $100 | Implemented |
DL0083 # 12 Y:2012 | 12 | 2012 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $300 | $100 | Implemented |
DL0080 # 01 Y:2012 | 01 | 2012 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $3,088 | $100 | Implemented |