IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,224

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TT0147 # 10 Y:2015 10 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $124 $413 Implemented
TT0147 # 11 Y:2015 11 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,330 $16,510 Implemented
TT0147 # 01 Y:2015 01 2015 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $875 $750 Implemented
TT0147 # 02 Y:2015 02 2015 REPAIR OR REPLACE STEAM TRAPS $5,772 $430 Implemented
TT0147 # 03 Y:2015 03 2015 REPAIR OR REPLACE STEAM TRAPS $1,127 $230 Implemented
TT0147 # 04 Y:2015 04 2015 INSULATE BARE EQUIPMENT $606 $567 Not Implemented
TT0147 # 05 Y:2015 05 2015 INSULATE BARE EQUIPMENT $430 $660 Not Implemented
NC0532 # 01 Y:2015 01 2015 REPLACE ELECTRIC MOTORS WITH BACK PRESSURE STEAM TURBINES AND USE EXHAUST STEAM FOR PROCESS HEAT $48,749 $105,000 Not Implemented
NC0532 # 02 Y:2015 02 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $29,143 $73,960 Implemented
NC0532 # 03 Y:2015 03 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $773 $240 Implemented
NC0532 # 04 Y:2015 04 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $353 $438 Implemented
NC0532 # 05 Y:2015 05 2015 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $18,636 $45,000 Implemented
NC0532 # 06 Y:2015 06 2015 REPAIR OR REPLACE STEAM TRAPS $17,917 $8,000 Not Implemented
NC0532 # 07 Y:2015 07 2015 INSTALL / REPAIR INSULATION ON STEAM LINES $1,753 $1,620 Implemented
NC0532 # 08 Y:2015 08 2015 REPAIR AND ELIMINATE STEAM LEAKS $990 $450 Implemented
NC0532 # 09 Y:2015 09 2015 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $15,703 $500 Not Implemented
NC0532 # 10 Y:2015 10 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,952 $100 Not Implemented
NC0532 # 11 Y:2015 11 2015 REDUCE FLUID FLOW RATES $8,338 $5,000 Not Implemented
NC0532 # 12 Y:2015 12 2015 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,924 $1,935 Not Implemented
NC0523 # 01 Y:2014 01 2014 MODIFY PROCESS TO REDUCE MATERIAL USE/COST $156,000 $600,000 Not Implemented
NC0523 # 02 Y:2014 02 2014 OPTIMIZE PRODUCTION LOT SIZES AND INVENTORIES $78,330 $120,000 Not Implemented
NC0523 # 03 Y:2014 03 2014 REPLACE BOILER $58,620 $90,000 Not Implemented
NC0523 # 04 Y:2014 04 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $30,419 $146,762 Not Implemented
NC0523 # 05 Y:2014 05 2014 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $8,560 $2,500 Not Implemented
NC0523 # 06 Y:2014 06 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $944 $3,012 Implemented