IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,059

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WM0155 # 05 Y:2020 05 2020 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,761 $3,855 Not Implemented
WM0155 # 06 Y:2020 06 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,679 $1,750 Not Implemented
WM0155 # 07 Y:2020 07 2020 USE PHOTOCELL CONTROLS $541 $1,075 Not Implemented
WM0155 # 08 Y:2020 08 2020 INSTALL OCCUPANCY SENSORS $451 $750 Not Implemented
WM0155 # 09 Y:2020 09 2020 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $366 $1,250 Implemented
WM0155 # 10 Y:2020 10 2020 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $360 $0 Implemented
IC0233 # 01 Y:2020 01 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $329 $167 Not Implemented
IC0233 # 02 Y:2020 02 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,040 $167 Not Implemented
IC0233 # 03 Y:2020 03 2020 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,788 $861 Not Implemented
IC0233 # 04 Y:2020 04 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,778 $2,589 Not Implemented
WM0153 # 01 Y:2020 01 2020 USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT $7,809 $75,000 Not Implemented
WM0153 # 02 Y:2020 02 2020 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $4,227 $20,000 Not Implemented
WM0153 # 03 Y:2020 03 2020 USE SYNTHETIC LUBRICANT $3,015 $6,600 Not Implemented
WM0153 # 04 Y:2020 04 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,170 $5,633 Not Implemented
WM0153 # 05 Y:2020 05 2020 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,114 $232 Not Implemented
WM0153 # 06 Y:2020 06 2020 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $475 $2,110 Not Implemented
WM0153 # 07 Y:2020 07 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $376 $25 Implemented
WM0152 # 03 Y:2020 03 2020 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,181 $8,340 Not Implemented
WM0152 # 04 Y:2020 04 2020 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,130 $5,580 Implemented
WM0152 # 05 Y:2020 05 2020 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $2,662 $16,000 Not Implemented
WM0152 # 06 Y:2020 06 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,891 $4,160 Not Implemented
WM0152 # 01 Y:2020 01 2020 USE SOLAR HEAT TO MAKE ELECTRICTY $12,116 $86,310 Not Implemented
WM0152 # 02 Y:2020 02 2020 USE SYNTHETIC LUBRICANT $11,295 $6,800 Implemented
WM0151 # 01 Y:2019 01 2019 USE SOLAR HEAT TO MAKE ELECTRICTY $15,820 $47,000 Not Implemented
WM0151 # 02 Y:2019 02 2019 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $12,520 $29,000 Not Implemented