IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,417

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0191 # 02 Y:1990 02 1990 OPTIMIZE PLANT POWER FACTOR $4,754 $9,230 Not Implemented
MA0191 # 03 Y:1990 03 1990 RECOVER WASTE HEAT FROM EQUIPMENT $1,162 $476 Implemented
MA0191 # 04 Y:1990 04 1990 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,066 $4,648 Not Implemented
MA0191 # 05 Y:1990 05 1990 AIR CONDITION ONLY SPACE NECESSARY $7,339 $3,720 Implemented
MA0192 # 01 Y:1990 01 1990 AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM $2,182 $2,878 Not Implemented
MA0192 # 02 Y:1990 02 1990 INSTALL TIMERS AND/OR THERMOSTATS $4,701 $4,950 Implemented
MA0192 # 03 Y:1990 03 1990 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,493 $40,000 Implemented
MA0192 # 04 Y:1990 04 1990 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $2,150 $0 Not Implemented
MA0192 # 05 Y:1990 05 1990 INSTALL SET-BACK TIMERS $1,214 $732 Implemented
MA0192 # 06 Y:1990 06 1990 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,312 $942 Implemented
MA0192 # 07 Y:1990 07 1990 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $162 $436 Implemented
MA0192 # 08 Y:1990 08 1990 INSTALL TIMERS AND/OR THERMOSTATS $436 $200 Implemented
MA0193 # 01 Y:1990 01 1990 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $984 $426 Implemented
MA0193 # 02 Y:1990 02 1990 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $13,252 $12,000 Not Implemented
MA0193 # 03 Y:1990 03 1990 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $40,469 $5,400 Implemented
MA0193 # 04 Y:1990 04 1990 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $173 $348 Not Implemented
MA0193 # 05 Y:1990 05 1990 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $13,037 $2,609 Not Implemented
MA0193 # 06 Y:1990 06 1990 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $5,438 $0 Implemented
MA0194 # 01 Y:1990 01 1990 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $503 $79 Implemented
MA0194 # 02 Y:1990 02 1990 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $25,980 $38,667 Implemented
MA0194 # 03 Y:1990 03 1990 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $96 $89 Implemented
MA0194 # 04 Y:1990 04 1990 INSULATE BARE EQUIPMENT $2,541 $7,188 Not Implemented
MA0194 # 05 Y:1990 05 1990 INSULATE BARE EQUIPMENT $520 $223 Implemented
MA0194 # 06 Y:1990 06 1990 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS $2,174 $3,875 Not Implemented
MA0194 # 07 Y:1990 07 1990 HEAT WATER WITH EXHAUST HEAT $656 $494 Implemented