Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
3,091
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
AM0133 # 03 Y:1991 | 03 | 1991 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $750 | $627 | Not Implemented |
AM0133 # 04 Y:1991 | 04 | 1991 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $690 | $300 | Not Implemented |
AM0133 # 05 Y:1991 | 05 | 1991 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $120 | $0 | Not Implemented |
AM0133 # 06 Y:1991 | 06 | 1991 | USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER | $245 | $635 | Not Implemented |
MA0225 # 01 Y:1991 | 01 | 1991 | INSTALL SMALLER BOILER (INCREASE HIGH FIRE DUTY CYCLE) | $8,474 | $43,800 | Not Implemented |
MA0225 # 02 Y:1991 | 02 | 1991 | USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE | $5,481 | $11,200 | Not Implemented |
MA0225 # 03 Y:1991 | 03 | 1991 | INSTALL / REPAIR INSULATION ON STEAM LINES | $1,764 | $2,625 | Not Implemented |
MA0225 # 04 Y:1991 | 04 | 1991 | INSTALL SET-BACK TIMERS | $1,367 | $660 | Implemented |
MA0225 # 05 Y:1991 | 05 | 1991 | REPAIR OR REPLACE STEAM TRAPS | $970 | $970 | Implemented |
MA0225 # 06 Y:1991 | 06 | 1991 | INSULATE BARE EQUIPMENT | $987 | $689 | Not Implemented |
MA0225 # 07 Y:1991 | 07 | 1991 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $551 | $0 | Implemented |
MA0225 # 08 Y:1991 | 08 | 1991 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $341 | $550 | Not Implemented |
MA0226 # 01 Y:1991 | 01 | 1991 | MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE | $11,242 | $21,238 | Implemented |
MA0226 # 02 Y:1991 | 02 | 1991 | INSTALL TIMERS AND/OR THERMOSTATS | $6,376 | $0 | Implemented |
MA0226 # 03 Y:1991 | 03 | 1991 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $5,696 | $0 | Implemented |
MA0226 # 04 Y:1991 | 04 | 1991 | RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR | $3,079 | $9,000 | Implemented |
MA0226 # 05 Y:1991 | 05 | 1991 | INSULATE BARE EQUIPMENT | $3,303 | $856 | Implemented |
MA0226 # 06 Y:1991 | 06 | 1991 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $255 | $3,020 | Implemented |
MA0227 # 01 Y:1991 | 01 | 1991 | OPTIMIZE PLANT POWER FACTOR | $4,097 | $12,000 | Not Implemented |
MA0227 # 02 Y:1991 | 02 | 1991 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,375 | $1,566 | Not Implemented |
MA0227 # 03 Y:1991 | 03 | 1991 | INSULATE BARE EQUIPMENT | $974 | $1,350 | Not Implemented |
AS0039 # 01 Y:1991 | 01 | 1991 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $6,490 | $35,000 | Not Implemented |
AS0039 # 02 Y:1991 | 02 | 1991 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $4,531 | $1,000 | Not Implemented |
AS0039 # 03 Y:1991 | 03 | 1991 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $240 | $200 | Not Implemented |
AS0039 # 04 Y:1991 | 04 | 1991 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,175 | $300 | Not Implemented |