IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,091

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0225 # 02 Y:1991 02 1991 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $5,481 $11,200 Not Implemented
MA0225 # 03 Y:1991 03 1991 INSTALL / REPAIR INSULATION ON STEAM LINES $1,764 $2,625 Not Implemented
MA0225 # 04 Y:1991 04 1991 INSTALL SET-BACK TIMERS $1,367 $660 Implemented
MA0225 # 05 Y:1991 05 1991 REPAIR OR REPLACE STEAM TRAPS $970 $970 Implemented
MA0225 # 06 Y:1991 06 1991 INSULATE BARE EQUIPMENT $987 $689 Not Implemented
MA0225 # 07 Y:1991 07 1991 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $551 $0 Implemented
MA0225 # 08 Y:1991 08 1991 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $341 $550 Not Implemented
MA0226 # 01 Y:1991 01 1991 MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE $11,242 $21,238 Implemented
MA0226 # 02 Y:1991 02 1991 INSTALL TIMERS AND/OR THERMOSTATS $6,376 $0 Implemented
MA0226 # 03 Y:1991 03 1991 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $5,696 $0 Implemented
MA0226 # 04 Y:1991 04 1991 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $3,079 $9,000 Implemented
MA0226 # 05 Y:1991 05 1991 INSULATE BARE EQUIPMENT $3,303 $856 Implemented
MA0226 # 06 Y:1991 06 1991 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $255 $3,020 Implemented
MA0227 # 01 Y:1991 01 1991 OPTIMIZE PLANT POWER FACTOR $4,097 $12,000 Not Implemented
MA0227 # 02 Y:1991 02 1991 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,375 $1,566 Not Implemented
MA0227 # 03 Y:1991 03 1991 INSULATE BARE EQUIPMENT $974 $1,350 Not Implemented
AS0039 # 01 Y:1991 01 1991 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $6,490 $35,000 Not Implemented
AS0039 # 02 Y:1991 02 1991 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $4,531 $1,000 Not Implemented
AS0039 # 03 Y:1991 03 1991 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $240 $200 Not Implemented
AS0039 # 04 Y:1991 04 1991 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,175 $300 Not Implemented
AS0039 # 05 Y:1991 05 1991 IMPROVE LUBRICATION PRACTICES $392 $0 Not Implemented
AS0039 # 06 Y:1991 06 1991 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $261 $663 Not Implemented
AS0039 # 07 Y:1991 07 1991 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $187 $0 Not Implemented
AS0039 # 08 Y:1991 08 1991 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $496 $3,190 Not Implemented
AS0039 # 09 Y:1991 09 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $397 $30 Not Implemented