Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
4,043
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WV0477 # 04 Y:2013 | 04 | 2013 | ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM | $1,996 | $1,000 | Not Implemented |
WV0477 # 03 Y:2013 | 03 | 2013 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,064 | $3,573 | Not Implemented |
WV0477 # 02 Y:2013 | 02 | 2013 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $2,823 | $6,345 | Not Implemented |
WV0477 # 01 Y:2013 | 01 | 2013 | INSULATE BARE EQUIPMENT | $3,015 | $2,013 | Implemented |
WV0476 # 04 Y:2013 | 04 | 2013 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $2,749 | $5,400 | Not Implemented |
WV0476 # 01 Y:2013 | 01 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $15,046 | $26,555 | Implemented |
WV0476 # 02 Y:2013 | 02 | 2013 | INSTALL TIMERS AND/OR THERMOSTATS | $13,346 | $4,200 | Implemented |
WV0476 # 03 Y:2013 | 03 | 2013 | COMBINE UTILITY METERS | $3,940 | $1,800 | Not Implemented |
WV0476 # 05 Y:2013 | 05 | 2013 | RECOVER WASTE HEAT FROM EQUIPMENT | $845 | $1,940 | Implemented |
WV0476 # 06 Y:2013 | 06 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $756 | $3,667 | Not Implemented |
WV0476 # 08 Y:2013 | 08 | 2013 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $621 | $233 | Not Implemented |
WV0476 # 09 Y:2013 | 09 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $595 | $1,431 | Implemented |
WV0476 # 07 Y:2013 | 07 | 2013 | AIR CONDITION ONLY SPACE NECESSARY | $643 | $3,920 | Not Implemented |
WV0476 # 10 Y:2013 | 10 | 2013 | REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES | $301 | $90 | Implemented |
WV0476 # 11 Y:2013 | 11 | 2013 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $259 | $140 | Implemented |
WV0476 # 12 Y:2013 | 12 | 2013 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $251 | $50 | Implemented |
UK1317 # 01 Y:2013 | 01 | 2013 | RECOVER WASTE HEAT FROM EQUIPMENT | $139,142 | $342,000 | Implemented |
UK1317 # 02 Y:2013 | 02 | 2013 | OPTIMIZE PLANT POWER FACTOR | $11,706 | $17,700 | Implemented |
UK1317 # 03 Y:2013 | 03 | 2013 | UPGRADE CONTROLS ON COMPRESSORS | $15,719 | $35,000 | Not Implemented |
UK1317 # 04 Y:2013 | 04 | 2013 | ELIMINATE/REDUCE AN OPERATION | $12,899 | $0 | Not Implemented |
UK1317 # 05 Y:2013 | 05 | 2013 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $8,519 | $0 | Not Implemented |
UK1317 # 06 Y:2013 | 06 | 2013 | CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS | $3,200 | $1,900 | Implemented |
UM0434 # 01 Y:2013 | 01 | 2013 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $11,289 | $500 | Not Implemented |
UM0434 # 02 Y:2013 | 02 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $10,543 | $17,630 | Implemented |
UM0434 # 03 Y:2013 | 03 | 2013 | REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT | $7,121 | $16,500 | Implemented |