IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

7,723

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UF0330 # 06 Y:2003 06 2003 AUTOMATE FINISHING PROCESS $132,990 $300,000 Not Implemented
MI0065 # 01 Y:2003 01 2003 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $12,419 $0 n/a
MI0065 # 02 Y:2003 02 2003 TURN OFF EQUIPMENT WHEN NOT IN USE $19,897 $1,900 n/a
MI0065 # 03 Y:2003 03 2003 INSTALL / REPAIR INSULATION ON STEAM LINES $2,876 $4,556 n/a
MI0065 # 04 Y:2003 04 2003 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $207 $325 n/a
MI0065 # 05 Y:2003 05 2003 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $370 $85 n/a
MI0065 # 06 Y:2003 06 2003 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $42 $231 n/a
MI0065 # 07 Y:2003 07 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $283 $244 n/a
MI0065 # 08 Y:2003 08 2003 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $2,740 $8,820 n/a
MI0064 # 01 Y:2003 01 2003 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,766 $3,951 Not Implemented
MI0064 # 02 Y:2003 02 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $287 $24 Implemented
MI0064 # 03 Y:2003 03 2003 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $233 $458 Not Implemented
MI0064 # 04 Y:2003 04 2003 TURN OFF EQUIPMENT WHEN NOT IN USE $57,321 $6,188 Implemented
MI0064 # 05 Y:2003 05 2003 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $5,458 $32,500 Not Implemented
MI0064 # 06 Y:2003 06 2003 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $1,223 $9 Implemented
MI0063 # 01 Y:2003 01 2003 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS $125,255 $28,140 Implemented
MI0063 # 02 Y:2003 02 2003 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $417 $189 Not Implemented
MI0063 # 03 Y:2003 03 2003 TURN OFF EQUIPMENT WHEN NOT IN USE $327 $75 Not Implemented
MI0063 # 04 Y:2003 04 2003 ELIMINATE OLD STOCK AND MODIFY INVENTORY CONTROL $15,652 $4,000 Not Implemented
MI0063 # 05 Y:2003 05 2003 TURN OFF EQUIPMENT WHEN NOT IN USE $3,095 $169 Implemented
MI0063 # 06 Y:2003 06 2003 TURN OFF EQUIPMENT WHEN NOT IN USE $5,893 $4,420 Implemented
UF0328 # 01 Y:2003 01 2003 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $10,395 $0 Implemented
UF0328 # 02 Y:2003 02 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,817 $12,292 Implemented
UF0328 # 03 Y:2003 03 2003 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $14,183 $11,058 Not Implemented
UF0328 # 04 Y:2003 04 2003 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,810 $0 Implemented