Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
5,333
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
GT0683 # 06 Y:2000 | 06 | 2000 | USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION | $5,364 | $11,500 | Implemented |
GT0683 # 07 Y:2000 | 07 | 2000 | USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING | $595 | $1,275 | Not Implemented |
GT0683 # 08 Y:2000 | 08 | 2000 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $43,775 | $28,880 | Not Implemented |
GT0683 # 09 Y:2000 | 09 | 2000 | REUSE / RECYCLE/ SELL PAPER PRODUCTS | $2,190 | $1,000 | Implemented |
WI0365 # 01 Y:2000 | 01 | 2000 | USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT | $302,692 | $770,000 | Not Implemented |
WI0365 # 02 Y:2000 | 02 | 2000 | INSTALL SENSORS TO DETECT DEFECTS | $100,000 | $70,000 | Not Implemented |
WI0365 # 03 Y:2000 | 03 | 2000 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $8,830 | $26,500 | Implemented |
WI0365 # 04 Y:2000 | 04 | 2000 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $9,131 | $5,808 | Implemented |
WI0365 # 05 Y:2000 | 05 | 2000 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,017 | $0 | Implemented |
WI0365 # 06 Y:2000 | 06 | 2000 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $3,168 | $7,500 | Implemented |
WI0365 # 07 Y:2000 | 07 | 2000 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,922 | $600 | Implemented |
AS0270 # 01 Y:2000 | 01 | 2000 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,324 | $6,008 | Implemented |
AS0270 # 02 Y:2000 | 02 | 2000 | INSTALL OCCUPANCY SENSORS | $896 | $300 | Not Implemented |
AS0270 # 03 Y:2000 | 03 | 2000 | UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT | $2,275 | $1,890 | Not Implemented |
AS0270 # 04 Y:2000 | 04 | 2000 | UPGRADE CONTROLS ON COMPRESSORS | $1,608 | $200 | Implemented |
AS0270 # 05 Y:2000 | 05 | 2000 | USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL | $516 | $60 | Not Implemented |
AS0270 # 06 Y:2000 | 06 | 2000 | USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL | $190 | $95 | Not Implemented |
AS0270 # 07 Y:2000 | 07 | 2000 | MODIFY CURRENT INCENTIVE PROGRAM | $269,180 | $100,000 | Implemented |
ME0283 # 01 Y:2000 | 01 | 2000 | INSTALL EQUIPMENT TO MOVE PRODUCT | $20,000 | $130 | Not Implemented |
ME0283 # 02 Y:2000 | 02 | 2000 | USE SMALL NUMBER OF HIGH OUTPUT UNITS INSTEAD OF MANY SMALL INEFFICIENT UNITS | $8,241 | $10,900 | Not Implemented |
ME0283 # 03 Y:2000 | 03 | 2000 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,561 | $500 | Implemented |
ME0283 # 04 Y:2000 | 04 | 2000 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,294 | $300 | Implemented |
ME0283 # 05 Y:2000 | 05 | 2000 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $792 | $210 | Not Implemented |
ME0283 # 06 Y:2000 | 06 | 2000 | METER WASTE WATER | $853 | $0 | Not Implemented |
CO0456 # 01 Y:2000 | 01 | 2000 | OPTIMIZE PLANT POWER FACTOR | $5,620 | $15,400 | n/a |