IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,333

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
GT0683 # 06 Y:2000 06 2000 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $5,364 $11,500 Implemented
GT0683 # 07 Y:2000 07 2000 USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING $595 $1,275 Not Implemented
GT0683 # 08 Y:2000 08 2000 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $43,775 $28,880 Not Implemented
GT0683 # 09 Y:2000 09 2000 REUSE / RECYCLE/ SELL PAPER PRODUCTS $2,190 $1,000 Implemented
WI0365 # 01 Y:2000 01 2000 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $302,692 $770,000 Not Implemented
WI0365 # 02 Y:2000 02 2000 INSTALL SENSORS TO DETECT DEFECTS $100,000 $70,000 Not Implemented
WI0365 # 03 Y:2000 03 2000 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $8,830 $26,500 Implemented
WI0365 # 04 Y:2000 04 2000 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $9,131 $5,808 Implemented
WI0365 # 05 Y:2000 05 2000 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,017 $0 Implemented
WI0365 # 06 Y:2000 06 2000 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $3,168 $7,500 Implemented
WI0365 # 07 Y:2000 07 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,922 $600 Implemented
AS0270 # 01 Y:2000 01 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,324 $6,008 Implemented
AS0270 # 02 Y:2000 02 2000 INSTALL OCCUPANCY SENSORS $896 $300 Not Implemented
AS0270 # 03 Y:2000 03 2000 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $2,275 $1,890 Not Implemented
AS0270 # 04 Y:2000 04 2000 UPGRADE CONTROLS ON COMPRESSORS $1,608 $200 Implemented
AS0270 # 05 Y:2000 05 2000 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $516 $60 Not Implemented
AS0270 # 06 Y:2000 06 2000 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $190 $95 Not Implemented
AS0270 # 07 Y:2000 07 2000 MODIFY CURRENT INCENTIVE PROGRAM $269,180 $100,000 Implemented
ME0283 # 01 Y:2000 01 2000 INSTALL EQUIPMENT TO MOVE PRODUCT $20,000 $130 Not Implemented
ME0283 # 02 Y:2000 02 2000 USE SMALL NUMBER OF HIGH OUTPUT UNITS INSTEAD OF MANY SMALL INEFFICIENT UNITS $8,241 $10,900 Not Implemented
ME0283 # 03 Y:2000 03 2000 RECOVER WASTE HEAT FROM EQUIPMENT $1,561 $500 Implemented
ME0283 # 04 Y:2000 04 2000 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,294 $300 Implemented
ME0283 # 05 Y:2000 05 2000 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $792 $210 Not Implemented
ME0283 # 06 Y:2000 06 2000 METER WASTE WATER $853 $0 Not Implemented
CO0456 # 01 Y:2000 01 2000 OPTIMIZE PLANT POWER FACTOR $5,620 $15,400 n/a