IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,333

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
CO0456 # 02 Y:2000 02 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,920 $470 n/a
CO0456 # 03 Y:2000 03 2000 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,910 $4,030 n/a
CO0456 # 04 Y:2000 04 2000 DIRECT WARMEST AIR TO COMBUSTION INTAKE $930 $1,400 n/a
CO0456 # 05 Y:2000 05 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $320 $0 n/a
CO0456 # 06 Y:2000 06 2000 USE IN-PROCESS RECYCLING WHENEVER POSSIBLE $407,670 $10,000 n/a
CO0456 # 07 Y:2000 07 2000 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $130 $0 n/a
CO0456 # 08 Y:2000 08 2000 USE FIXTURES TO REDUCE MACHINE CHANGEOUT TIMES $31,200 $25,000 n/a
CO0456 # 09 Y:2000 09 2000 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $9,850 $250 n/a
WV0182 # 01 Y:2000 01 2000 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,539 $60 Implemented
WV0182 # 02 Y:2000 02 2000 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,677 $175 Implemented
WV0182 # 03 Y:2000 03 2000 UTILIZE A LESS EXPENSIVE COOLING METHOD $5,450 $1,870 Not Implemented
WV0182 # 04 Y:2000 04 2000 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $1,200 $70 Implemented
WV0182 # 05 Y:2000 05 2000 INSTALL SPECTRAL REFLECTORS / DELAMP $1,009 $1,458 Implemented
WV0182 # 06 Y:2000 06 2000 REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS $35,688 $6,000 Not Implemented
WV0182 # 07 Y:2000 07 2000 USE COLD WASTE WATER TO COOL CHILLER FEED WATER $7,785 $12,000 Not Implemented
WV0182 # 08 Y:2000 08 2000 USE FILTRATION, CENTRIFUGING TO REMOVE CONTAMINANTS $56,000 $69,950 Not Implemented
WV0182 # 09 Y:2000 09 2000 DIRECT WASTE GASSES TO BOILER COMBUSTION AIR $119,000 $250,000 Not Implemented
WV0182 # 10 Y:2000 10 2000 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $20,000 $7,000 Implemented
ND0345 # 01 Y:2000 01 2000 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $386 $0 Implemented
ND0345 # 02 Y:2000 02 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $587 $590 Implemented
ND0345 # 03 Y:2000 03 2000 USE PHOTOCELL CONTROLS $124 $350 Not Implemented
ND0345 # 04 Y:2000 04 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $862 $6,560 Implemented
ND0345 # 05 Y:2000 05 2000 UTILIZE A LESS EXPENSIVE COOLING METHOD $913 $0 Implemented
ND0345 # 06 Y:2000 06 2000 ELIMINATE/REDUCE REDUNDANT INSPECTIONS $134 $0 Implemented
ND0345 # 07 Y:2000 07 2000 USE PLANT OWNED TRANSFORMERS OR LEASE TRANSFORMERS $2,211 $200 Not Implemented