IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,394

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LE0179 # 06 Y:2004 06 2004 USE SYNTHETIC LUBRICANT $573 $500 Implemented
LE0179 # 07 Y:2004 07 2004 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $532 $0 Not Implemented
LE0179 # 08 Y:2004 08 2004 REUSE / RECYCLE/ SELL PAPER PRODUCTS $451 $0 Implemented
LE0179 # 09 Y:2004 09 2004 INSULATE BARE EQUIPMENT $218 $279 Not Implemented
LE0179 # 10 Y:2004 10 2004 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $215 $0 Implemented
GT0777 # 01 Y:2004 01 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $7,136 $0 Implemented
GT0777 # 02 Y:2004 02 2004 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $14,877 $800 Implemented
GT0777 # 03 Y:2004 03 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $12,295 $1,400 Implemented
GT0777 # 04 Y:2004 04 2004 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $10,122 $10,970 Implemented
GT0777 # 05 Y:2004 05 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,910 $1,000 Implemented
GT0777 # 06 Y:2004 06 2004 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $2,122 $2,320 Implemented
GT0777 # 07 Y:2004 07 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $19,878 $81,651 n/a
GT0777 # 08 Y:2004 08 2004 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $13,327 $20,670 n/a
AM0453 # 01 Y:2004 01 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,040 $500 Implemented
AM0453 # 02 Y:2004 02 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $930 $15 Not Implemented
AM0453 # 03 Y:2004 03 2004 REPAIR AND ELIMINATE STEAM LEAKS $700 $100 Not Implemented
AM0453 # 04 Y:2004 04 2004 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $660 $0 Implemented
AM0453 # 05 Y:2004 05 2004 INSTALL / REPAIR INSULATION ON STEAM LINES $370 $250 Implemented
AM0453 # 06 Y:2004 06 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $134 $70 Not Implemented
AM0453 # 07 Y:2004 07 2004 INSULATE BARE EQUIPMENT $120 $140 Not Implemented
AM0453 # 08 Y:2004 08 2004 REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS $90 $10 Not Implemented
SU0176 # 01 Y:2004 01 2004 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $50 $0 Not Implemented
SU0176 # 02 Y:2004 02 2004 INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN $19,192 $4,348 Implemented
SU0176 # 03 Y:2004 03 2004 USE MAGNETIC TECHNOLOGY TO TREAT WATER $2,160 $939 Implemented
SU0176 # 04 Y:2004 04 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $934 $434 Implemented