IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

7,723

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MI0058 # 01 Y:2003 01 2003 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $11,548 $2,000 Not Implemented
MI0058 # 02 Y:2003 02 2003 REPAIR OR REPLACE STEAM TRAPS $1,906 $696 Implemented
MI0058 # 03 Y:2003 03 2003 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,543 $223 Not Implemented
MI0058 # 04 Y:2003 04 2003 METER WASTE WATER $12,786 $1,950 Not Implemented
MI0058 # 05 Y:2003 05 2003 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $250,000 $43,000 Implemented
MI0058 # 06 Y:2003 06 2003 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $13,520 $400,000 Implemented
UF0321 # 01 Y:2003 01 2003 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $7,390 $2,948 Not Implemented
UF0321 # 02 Y:2003 02 2003 INSULATE BARE EQUIPMENT $1,530 $868 Not Implemented
UF0321 # 03 Y:2003 03 2003 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $17,331 $45,500 Implemented
UF0321 # 04 Y:2003 04 2003 UTILIZE A LESS EXPENSIVE COOLING METHOD $7,451 $740 Not Implemented
UF0321 # 05 Y:2003 05 2003 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,598 $376 Not Implemented
UF0321 # 06 Y:2003 06 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,755 $852 Not Implemented
UF0321 # 07 Y:2003 07 2003 LOWER LIGHT FIXTURES IN HIGH CEILING AREAS $15,954 $436 Implemented
UF0321 # 08 Y:2003 08 2003 PURCHASE NEW EQUIPMENT TO REDUCE MATERIAL USE / COST $18,000 $4,000 Implemented
UF0322 # 01 Y:2003 01 2003 DIRECT WARMEST AIR TO COMBUSTION INTAKE $2,080,457 $50,000 Not Implemented
UF0322 # 02 Y:2003 02 2003 USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT $1,420,987 $5,000,000 Not Implemented
UF0322 # 03 Y:2003 03 2003 ADD AREA LIGHTING SWITCHES $8,639 $303 Implemented
UF0322 # 04 Y:2003 04 2003 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $47,174 $0 Implemented
UF0322 # 05 Y:2003 05 2003 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $85,121 $87,198 Not Implemented
UF0322 # 06 Y:2003 06 2003 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $9,372 $0 Not Implemented
UF0322 # 07 Y:2003 07 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $25,483 $47,300 Not Implemented
UF0322 # 08 Y:2003 08 2003 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $81,073 $860 Not Implemented
UF0322 # 09 Y:2003 09 2003 LOWER LIGHT FIXTURES IN HIGH CEILING AREAS $159,201 $2,888 Not Implemented
UF0322 # 10 Y:2003 10 2003 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $1,466 $3,496 Not Implemented
MI0057 # 01 Y:2003 01 2003 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $17,331 $1,000 Not Implemented