Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Florida |
---|---|
Assessment Year | 2003 |
Principal Product | Circuit Boards |
NAICS | 334418 - Printed Circuit Assembly (Electronic Assembly) Manufacturing |
SIC | 3679 - Electronic Components, Nec |
Sales | $50,000,000-$100,000,000 |
# of Employees | 300 |
Plant Area (Sq.Ft.) | 150,000 |
Annual Production | 50,000,000 Pieces |
Production Hrs. Annual | 4,420 |
Location (State) | FL |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $339,893 | 6,664,449 | kWh | $0.05 |
Electricity Demand | $28,324 | 14,933 | kW-months/year | $1.90 |
Electricity Fees | $11,500 | - | $ | - |
TOTAL ENERGY COSTS | $405,065 | |||
RECOMMENDED SAVINGS* | $36,852 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | - |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Water Disposal | Increase in Production | Electricity Usage | Electricity Demand | Water Disposal | Increase in Production | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | Tgal | $ | % | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS |
Savings: $1,176 Cost: $13 |
$924 | 18,111 | $252 | 3 | - | - | - | - |
$924 18,111 kWh |
$252 3 kW-months/year |
- - Tgal |
- - % |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $5,653 Cost: $16,060 |
$4,501 | 88,256 | $1,152 | 13 | - | - | - | - |
$4,501 88,256 kWh |
$1,152 13 kW-months/year |
- - Tgal |
- - % |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS |
Savings: $4,492 Cost: $4,010 |
$4,492 | 65,100 | - | - | - | - | - | - |
$4,492 65,100 kWh |
- - kW-months/year |
- - Tgal |
- - % |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS |
Savings: $1,886 Cost: $626 |
$1,361 | 26,689 | $525 | 6 | - | - | - | - |
$1,361 26,689 kWh |
$525 6 kW-months/year |
- - Tgal |
- - % |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 3.4155 METER WASTE WATER |
Savings: $1,545 Cost: $1,700 |
- | - | - | - | $1,545 | 176,786 | - | - |
- - kWh |
- - kW-months/year |
$1,545 176,786 Tgal |
- - % |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 4.651 INSTALL BACK-UP EQUIPMENT |
Savings: $22,100 Cost: $120,000 |
- | - | - | - | - | - | $22,100 | - |
- - kWh |
- - kW-months/year |
- - Tgal |
$22,100 - % |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $36,852 Cost: $142,409 |
$11,278 | 198,156 | $1,929 | 22 | $1,545 | 176,786 | $22,100 | - | $11,278 198,156 kWh |
$1,929 22 kW-months/year |
$1,545 176,786 Tgal |
$22,100 - % |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: - Cost: - |
- | - | - | - | - | - | - | - | - - kWh |
- - kW-months/year |
- - Tgal |
- - % |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | Tgal | $ | % | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Water Disposal | Increase in Production | Electricity Usage | Electricity Demand | Water Disposal | Increase in Production |