IAC logo
IAC Assessment: UF0333
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UF0333
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Florida
Assessment Year 2003
Principal Product Circuit Boards
NAICS 334418 - Printed Circuit Assembly (Electronic Assembly) Manufacturing
SIC 3679 - Electronic Components, Nec
Sales $50,000,000-$100,000,000
# of Employees 300
Plant Area (Sq.Ft.) 150,000
Annual Production 50,000,000 Pieces
Production Hrs. Annual 4,420
Location (State) FL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $339,893 6,664,449 kWh $0.05
Electricity Demand $28,324 14,933 kW-months/year $1.90
Electricity Fees $11,500 - $ -
TOTAL ENERGY COSTS $405,065
RECOMMENDED SAVINGS* $36,852 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Water Disposal Increase in Production Electricity Usage Electricity Demand Water Disposal Increase in Production
$ kWh $ kW-months/year $ Tgal $ %
01: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$1,176
Cost:
$13
$924 18,111 $252 3 - - - - $924
18,111
kWh
$252
3
kW-months/year
-
-
Tgal
-
-
%
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$5,653
Cost:
$16,060
$4,501 88,256 $1,152 13 - - - - $4,501
88,256
kWh
$1,152
13
kW-months/year
-
-
Tgal
-
-
%
03: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$4,492
Cost:
$4,010
$4,492 65,100 - - - - - - $4,492
65,100
kWh
-
-
kW-months/year
-
-
Tgal
-
-
%
04: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$1,886
Cost:
$626
$1,361 26,689 $525 6 - - - - $1,361
26,689
kWh
$525
6
kW-months/year
-
-
Tgal
-
-
%
05: 3.4155 METER WASTE WATER Savings:
$1,545
Cost:
$1,700
- - - - $1,545 176,786 - - -
-
kWh
-
-
kW-months/year
$1,545
176,786
Tgal
-
-
%
06: 4.651 INSTALL BACK-UP EQUIPMENT Savings:
$22,100
Cost:
$120,000
- - - - - - $22,100 - -
-
kWh
-
-
kW-months/year
-
-
Tgal
$22,100
-
%
TOTAL RECOMMENDED Savings:
$36,852
Cost:
$142,409
$11,278 198,156 $1,929 22 $1,545 176,786 $22,100 - $11,278
198,156
kWh
$1,929
22
kW-months/year
$1,545
176,786
Tgal
$22,100
-
%
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
Tgal
-
-
%
Savings
Cost
$ kWh $ kW-months/year $ Tgal $ %