Select a Center

Arizona State University
Boise State University
Case Western Reserve University
Clemson University
Colorado State University
Georgia Institute of Technology
Indiana University-Purdue University
Lehigh University
Louisiana State University
North Carolina State
Oklahoma State University
Oregon State University
San Diego State University
San Francisco State University
Syracuse University
Tennessee Technological University
Texas A&M, College Station
University of Alabama
University of Dayton
University of Delaware
University of Florida
University of Illinois, Chicago
University of Kentucky
University of Massachusetts
University of Miami
University of Missouri-Columbia
University of Nebraska–Lincoln
University of Texas Rio Grande Valley
University of Utah
University of Wisconsin, Milwaukee
West Virginia University
IAC logo
IAC Assessment: UF0333
Sponsored by:
EERE AMO
IAC logo
IAC Assessment: UF0333
IAC Center University of Florida
Assessment Year 2003
Principal Product Circuit Boards
NAICS 334418 - Printed Circuit Assembly (Electronic Assembly) Manufacturing
SIC 3679 - Electronic Components, Nec
Sales $50,000,000
# of Employees 300
Plant Area (Sq.Ft.) 150,000
Annual Production 50,000,000 Pieces
Production Hrs. Annual 4,420
Location (State) FL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $339,893 6,664,449 kWh $0.05
Electricity Demand $28,324 14,933 kW-months/year $1.90
Electricity Fees $11,500 - $ -
TOTAL ENERGY COSTS $405,065
RECOMMENDED SAVINGS* $36,852 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Water Disposal Increase in Production Electricity Usage Electricity Demand Water Disposal Increase in Production
$ kWh $ kW-months/year $ Tgal $ %
01: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$1,176
Cost:
$13
$924 18,111 $252 3 - - - - $924
18,111
kWh
$252
3
kW-months/year
-
-
Tgal
-
-
%
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$5,653
Cost:
$16,060
$4,501 88,256 $1,152 13 - - - - $4,501
88,256
kWh
$1,152
13
kW-months/year
-
-
Tgal
-
-
%
03: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$4,492
Cost:
$4,010
$4,492 65,100 - - - - - - $4,492
65,100
kWh
-
-
kW-months/year
-
-
Tgal
-
-
%
04: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$1,886
Cost:
$626
$1,361 26,689 $525 6 - - - - $1,361
26,689
kWh
$525
6
kW-months/year
-
-
Tgal
-
-
%
05: 3.4155 METER WASTE WATER Savings:
$1,545
Cost:
$1,700
- - - - $1,545 176,786 - - -
-
kWh
-
-
kW-months/year
$1,545
176,786
Tgal
-
-
%
06: 4.6510 INSTALL BACK-UP EQUIPMENT Savings:
$22,100
Cost:
$120,000
- - - - - - $22,100 - -
-
kWh
-
-
kW-months/year
-
-
Tgal
$22,100
-
%
TOTAL RECOMMENDED Savings:
$36,852
Cost:
$142,409
$11,278 198,156 $1,929 22 $1,545 176,786 $22,100 - $11,278
198,156
kWh
$1,929
22
kW-months/year
$1,545
176,786
Tgal
$22,100
-
%
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
Tgal
-
-
%
Savings
Cost
$ kWh $ kW-months/year $ Tgal $ %
Electricity Usage Electricity Demand Water Disposal Increase in Production Electricity Usage Electricity Demand Water Disposal Increase in Production