IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

50,236

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MZ0090 # 04 Y:2012 04 2012 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $403 $1,159 Not Implemented
MZ0090 # 05 Y:2012 05 2012 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,567 $23,196 Not Implemented
MZ0090 # 06 Y:2012 06 2012 INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS $3,072 $12,000 Not Implemented
SF0416 # 01 Y:2012 01 2012 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $2,478 $0 Implemented
SF0416 # 02 Y:2012 02 2012 COMBINE UTILITY METERS $2,336 $1,600 Not Implemented
SF0416 # 03 Y:2012 03 2012 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $1,287 $2,705 Not Implemented
SF0416 # 04 Y:2012 04 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,614 $18,273 Implemented
MZ0085 # 01 Y:2012 01 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,648 $820 Not Implemented
MZ0085 # 02 Y:2012 02 2012 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $79,573 $6,500 Implemented
MZ0085 # 03 Y:2012 03 2012 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $72,621 $8,500 Implemented
MZ0085 # 04 Y:2012 04 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,801 $8,200 Implemented
NC0447 # 01 Y:2012 01 2012 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $2,468 $500 Implemented
NC0447 # 02 Y:2012 02 2012 INSULATE BARE EQUIPMENT $17,983 $2,000 Not Implemented
NC0447 # 03 Y:2012 03 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,895 $400 Implemented
NC0447 # 04 Y:2012 04 2012 INSULATE FEEDWATER TANK $339 $1,133 Not Implemented
NC0447 # 05 Y:2012 05 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,779 $84,121 Not Implemented
NC0447 # 06 Y:2012 06 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,190 $399 Not Implemented
UM0402 # 01 Y:2012 01 2012 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $6,681 $200 Implemented
UM0402 # 02 Y:2012 02 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,300 $200 Implemented
UM0402 # 03 Y:2012 03 2012 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,496 $2,000 Implemented
UM0402 # 04 Y:2012 04 2012 RECOVER WASTE HEAT FROM EQUIPMENT $7,600 $2,000 Not Implemented
UM0402 # 05 Y:2012 05 2012 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $4,676 $4,000 Not Implemented
UM0402 # 06 Y:2012 06 2012 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $19,391 $4,000 Not Implemented
UM0402 # 07 Y:2012 07 2012 USE HEAT IN FLUE GASES TO PREHEAT PRODUCTS OR MATERIALS $52,867 $2,000 Not Implemented
UM0402 # 08 Y:2012 08 2012 USE FLUE GASES IN RADIANT HEATER FOR SPACE HEATING, OVENS, ETC $11,060 $15,000 Not Implemented