IAC logo
IAC Assessment: NC0447
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: NC0447
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center North Carolina State
Assessment Year 2012
Principal Product Pre-cast concrete
NAICS 327390 - Other Concrete Product Manufacturing
SIC 3272 - Concrete Products, Nec
Sales $50,000,000-$100,000,000
# of Employees 175
Plant Area (Sq.Ft.) 220,000
Annual Production 85,000 Thousand Feet
Production Hrs. Annual 4,200
Location (State) SC
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $129,992 4,019,885 kWh $0.03
Electricity Demand $153,440 17,966 kW-months/year $8.54
Natural Gas $193,829 27,368 MMBtu $7.08
TOTAL ENERGY COSTS $477,261
RECOMMENDED SAVINGS* $39,654 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $5,363
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
01: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE Savings:
$2,468
Cost:
$500
$(-218) - $2,686 720 - - - - - - $(-218)
-
kWh
$2,686
720
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
02: 2.2511 INSULATE BARE EQUIPMENT Savings:
$17,983
Cost:
$2,000
$6,597 204,000 $5,226 612 $6,160 870 - - - - $6,597
204,000
kWh
$5,226
612
kW-months/year
$6,160
870
MMBtu
-
-
$
-
-
$
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$2,895
Cost:
$400
$2,127 65,783 $918 107 - - $(-150) - - - $2,127
65,783
kWh
$918
107
kW-months/year
-
-
MMBtu
$(-150)
-
$
-
-
$
04: 2.2123 INSULATE FEEDWATER TANK Savings:
$339
Cost:
$1,133
- - - - $339 48 - - - - -
-
kWh
-
-
kW-months/year
$339
48
MMBtu
-
-
$
-
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$14,779
Cost:
$84,121
$9,338 288,742 $7,051 826 - - - - $(-1,610) - $9,338
288,742
kWh
$7,051
826
kW-months/year
-
-
MMBtu
-
-
$
$(-1,610)
-
$
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,190
Cost:
$399
$470 14,529 $720 84 - - - - - - $470
14,529
kWh
$720
84
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$39,654
Cost:
$88,553
$18,314 573,054 $16,601 2,349 $6,499 918 $(-150) - $(-1,610) - $18,314
573,054
kWh
$16,601
2,349
kW-months/year
$6,499
918
MMBtu
$(-150)
-
$
$(-1,610)
-
$
TOTAL IMPLEMENTED Savings:
$5,363
Cost:
$900
$1,909 65,783 $3,604 827 - - $(-150) - - - $1,909
65,783
kWh
$3,604
827
kW-months/year
-
-
MMBtu
$(-150)
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost