IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,872

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
CO0408 # 05 Y:1998 05 1998 ELIMINATE/REDUCE AN OPERATION $520 $80 Implemented
MO0226 # 03 Y:1998 03 1998 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS $9,450 $15,000 n/a
MO0226 # 04 Y:1998 04 1998 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $5,155 $3,700 n/a
MO0226 # 05 Y:1998 05 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,777 $3,872 n/a
MO0226 # 06 Y:1998 06 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $116 $207 n/a
MO0226 # 07 Y:1998 07 1998 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $661 $80 n/a
MO0226 # 08 Y:1998 08 1998 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $10,841 $13,179 n/a
MO0226 # 09 Y:1998 09 1998 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $383 $0 n/a
MO0226 # 10 Y:1998 10 1998 ADOPT IN-HOUSE MATERIAL GENERATION $1,024,800 $2,968,600 n/a
MO0226 # 11 Y:1998 11 1998 USE PLASTIC PALLETS INSTEAD OF WOOD $175,000 $56,250 n/a
OR0312 # 01 Y:1998 01 1998 ELIMINATE SHIFT $25,580 $50,000 Implemented
OR0312 # 02 Y:1998 02 1998 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $4,110 $0 Implemented
OR0312 # 03 Y:1998 03 1998 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $16,830 $4,300 Not Implemented
OR0312 # 04 Y:1998 04 1998 INSTALL AUTOMATIC PACKING EQUIPMENT $26,975 $14,685 Not Implemented
OR0312 # 05 Y:1998 05 1998 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $1,805 $2,100 Not Implemented
OR0312 # 06 Y:1998 06 1998 MOVE PRODUCT USING MECHANICAL MEANS $46,000 $147,500 Implemented
OR0312 # 07 Y:1998 07 1998 USE FIXTURES TO REDUCE MACHINE CHANGEOUT TIMES $11,220 $44,000 Not Implemented
OR0312 # 08 Y:1998 08 1998 CONVERT COMBUSTION EQUIPMENT TO BURN NATURAL GAS $8,025 $55,400 Not Implemented
OR0312 # 09 Y:1998 09 1998 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,254 $1,000 Implemented
OR0312 # 10 Y:1998 10 1998 OPTIMIZE PLANT POWER FACTOR $2,358 $7,000 Not Implemented
OR0312 # 11 Y:1998 11 1998 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,455 $4,459 Implemented
ME0236 # 01 Y:1998 01 1998 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $20,829 $46,000 Not Implemented
ME0236 # 02 Y:1998 02 1998 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $6,526 $27,594 Implemented
ME0236 # 03 Y:1998 03 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,300 $18,666 Implemented
ME0236 # 04 Y:1998 04 1998 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,349 $400 Not Implemented