IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

146,354

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NC0632 # 02 Y:2019 02 2019 INSTALL OCCUPANCY SENSORS $183 $400 Not Implemented
NC0632 # 03 Y:2019 03 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $739 $360 Implemented
NC0632 # 04 Y:2019 04 2019 UPGRADE CONTROLS ON COMPRESSORS $357 $500 Implemented
NC0632 # 05 Y:2019 05 2019 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $43,288 $500 Implemented
UK1903 # 01 Y:2019 01 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $515 $0 n/a
UK1903 # 02 Y:2019 02 2019 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $1,579 $0 n/a
UK1903 # 03 Y:2019 03 2019 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $1,341 $0 n/a
UK1903 # 04 Y:2019 04 2019 INSTALL OCCUPANCY SENSORS $2,357 $717 n/a
UK1903 # 05 Y:2019 05 2019 LOWER LIGHT FIXTURES IN HIGH CEILING AREAS $311 $1,218 n/a
UK1903 # 06 Y:2019 06 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $451 $486 n/a
UK1903 # 07 Y:2019 07 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,016 $11,658 n/a
UK1903 # 08 Y:2019 08 2019 VENTILATION SYSTEM TO SHUT OFF WHEN ROOM IS NOT IN USE $332 $0 n/a
UK1903 # 09 Y:2019 09 2019 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $8,326 $6,103 n/a
OK1010 # 01 Y:2019 01 2019 OPTIMIZE PLANT POWER FACTOR $4,905 $12,400 Implemented
OK1010 # 02 Y:2019 02 2019 INSTALL TIMERS AND/OR THERMOSTATS $7,438 $1,936 Implemented
OK1010 # 03 Y:2019 03 2019 CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS $1,032 $947 Implemented
OK1010 # 04 Y:2019 04 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $885 $1,760 Implemented
OK1010 # 05 Y:2019 05 2019 RECOVER WASTE HEAT FROM EQUIPMENT $1,024 $3,948 Not Implemented
OK1010 # 06 Y:2019 06 2019 USE OPTIMUM THICKNESS INSULATION $11,922 $53,750 Not Implemented
OK1010 # 07 Y:2019 07 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,016 $11,730 Not Implemented
SF0538 # 01 Y:2019 01 2019 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $146,044 $0 Not Implemented
SF0538 # 02 Y:2019 02 2019 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $29,680 $12,500 Implemented
SF0538 # 03 Y:2019 03 2019 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $15,353 $5,947 Implemented
SF0538 # 04 Y:2019 04 2019 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $27,526 $16,915 Not Implemented
SF0538 # 05 Y:2019 05 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $11,440 $7,616 Implemented