Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
5,642
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MO0005 # 02 Y:1990 | 02 | 1990 | SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY | $19,712 | $9,886 | Implemented |
MO0005 # 03 Y:1990 | 03 | 1990 | RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR | $6,935 | $351 | Not Implemented |
MO0005 # 04 Y:1990 | 04 | 1990 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $2,436 | $3,500 | Implemented |
MO0005 # 05 Y:1990 | 05 | 1990 | INSTALL AUTOMATIC STACK DAMPER | $585 | $175 | Implemented |
MO0005 # 06 Y:1990 | 06 | 1990 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $90 | $72 | Implemented |
MO0002 # 01 Y:1990 | 01 | 1990 | INSULATE BARE EQUIPMENT | $7,308 | $18,163 | Not Implemented |
MO0002 # 02 Y:1990 | 02 | 1990 | USE MINIMUM SAFE OVEN VENTILATION | $4,111 | $760 | Not Implemented |
MO0002 # 03 Y:1990 | 03 | 1990 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,186 | $100 | Implemented |
MO0002 # 04 Y:1990 | 04 | 1990 | INSULATE BARE EQUIPMENT | $2,183 | $5,826 | Not Implemented |
MO0002 # 05 Y:1990 | 05 | 1990 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,165 | $150 | Implemented |
MO0002 # 06 Y:1990 | 06 | 1990 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $814 | $930 | Not Implemented |
KU0314 # 01 Y:1990 | 01 | 1990 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $532 | $600 | Implemented |
KU0314 # 02 Y:1990 | 02 | 1990 | INCREASE AMOUNT OF CONDENSATE RETURNED | $20,739 | $22,000 | Implemented |
KU0314 # 03 Y:1990 | 03 | 1990 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $538 | $0 | Implemented |
KU0314 # 04 Y:1990 | 04 | 1990 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,014 | $1,587 | Implemented |
KU0314 # 05 Y:1990 | 05 | 1990 | RECOVER AND REUSE COOLING WATER | $5,719 | $2,000 | Implemented |
KU0314 # 06 Y:1990 | 06 | 1990 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $986 | $40 | Not Implemented |
KU0314 # 07 Y:1990 | 07 | 1990 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $306 | $150 | Implemented |
MO0001 # 01 Y:1990 | 01 | 1990 | MODIFY DYE BECK | $30,784 | $16,000 | Implemented |
MO0001 # 02 Y:1990 | 02 | 1990 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $3,122 | $2,500 | Not Implemented |
MO0001 # 03 Y:1990 | 03 | 1990 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $2,351 | $900 | Implemented |
MO0001 # 04 Y:1990 | 04 | 1990 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,805 | $750 | Implemented |
MO0001 # 05 Y:1990 | 05 | 1990 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $375 | $137 | Implemented |
MO0001 # 06 Y:1990 | 06 | 1990 | USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER | $256 | $500 | Not Implemented |
KU0308 # 01 Y:1990 | 01 | 1990 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $27,543 | $23,000 | Implemented |