IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,105

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0526 # 03 Y:2003 03 2003 INSULATE BARE EQUIPMENT $5,194 $5,150 n/a
MA0526 # 04 Y:2003 04 2003 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,324 $11,500 n/a
MA0526 # 05 Y:2003 05 2003 INSULATE BARE EQUIPMENT $3,638 $6,300 Not Implemented
MA0526 # 06 Y:2003 06 2003 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $3,179 $2,970 Not Implemented
MA0526 # 07 Y:2003 07 2003 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $1,169 $0 Implemented
MA0526 # 08 Y:2003 08 2003 INSTALL OCCUPANCY SENSORS $1,138 $600 Not Implemented
IA0309 # 01 Y:2003 01 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,309 $456 Implemented
IA0309 # 02 Y:2003 02 2003 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $518 $13 Implemented
IA0309 # 03 Y:2003 03 2003 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $121 $51 Not Implemented
IA0309 # 04 Y:2003 04 2003 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $1,235 $4,150 Not Implemented
IA0309 # 05 Y:2003 05 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $190 $0 Not Implemented
IA0309 # 06 Y:2003 06 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $278 $1,166 Not Implemented
IA0309 # 07 Y:2003 07 2003 INSTALL OCCUPANCY SENSORS $506 $798 Not Implemented
IA0309 # 08 Y:2003 08 2003 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $758 $1,900 Implemented
IA0309 # 09 Y:2003 09 2003 ELIMINATE OLD STOCK AND MODIFY INVENTORY CONTROL $6,386 $14,000 Not Implemented
IA0309 # 10 Y:2003 10 2003 APPLY FOR INVESTMENT INCENTIVES $1,191 $250 Not Implemented
AM0426 # 01 Y:2003 01 2003 REUSE RAGS UNTIL COMPLETELY SOILED $5,330 $0 Not Implemented
AM0426 # 02 Y:2003 02 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,310 $1,460 Not Implemented
AM0426 # 03 Y:2003 03 2003 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $1,950 $0 Not Implemented
AM0426 # 04 Y:2003 04 2003 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $1,420 $0 Not Implemented
AM0426 # 05 Y:2003 05 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $820 $500 Implemented
LL0153 # 01 Y:2003 01 2003 USE WASTE HEAT TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR $380,533 $1,670,381 Not Implemented
LL0153 # 02 Y:2003 02 2003 REPAIR AND ELIMINATE STEAM LEAKS $161,946 $1,070 Implemented
LL0153 # 03 Y:2003 03 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $33,083 $12,084 Implemented
LL0153 # 04 Y:2003 04 2003 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $5,268 $983 Not Implemented