IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

509

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SD0099 # 03 Y:1994 03 1994 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $47,221 $10,000 Not Implemented
SD0099 # 02 Y:1994 02 1994 RECOVER WASTE HEAT FROM EQUIPMENT $28,013 $50,500 Not Implemented
SD0098 # 06 Y:1994 06 1994 INSTALL OCCUPANCY SENSORS $177 $353 Not Implemented
SD0098 # 05 Y:1994 05 1994 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $1,627 $225 Not Implemented
SD0098 # 02 Y:1994 02 1994 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $6,808 $5,000 Implemented
SD0098 # 01 Y:1994 01 1994 STORE HEATED/ COOLED WATER FOR USE DURING PEAK DEMAND PERIODS $15,610 $32,459 Not Implemented
SD0098 # 04 Y:1994 04 1994 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $104 $27 Not Implemented
SD0098 # 03 Y:1994 03 1994 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $19,212 $15,000 Implemented
SF0043 # 10 Y:1994 10 1994 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $6,328 $550 Not Implemented
SF0043 # 04 Y:1994 04 1994 USE SYNTHETIC LUBRICANT $2,093 $0 Not Implemented
SF0043 # 01 Y:1994 01 1994 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $3,044 $2,794 Not Implemented
SF0043 # 06 Y:1994 06 1994 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $4,273 $3,317 Not Implemented
SF0043 # 05 Y:1994 05 1994 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,020 $250 Not Implemented
SF0043 # 07 Y:1994 07 1994 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $3,427 $2,665 Not Implemented
SF0043 # 08 Y:1994 08 1994 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,772 $10,800 Not Implemented
SF0043 # 09 Y:1994 09 1994 DIRECT WARMEST AIR TO COMBUSTION INTAKE $11,302 $3,350 Not Implemented
SF0043 # 03 Y:1994 03 1994 INSTALL OCCUPANCY SENSORS $2,561 $1,608 Not Implemented
SF0043 # 02 Y:1994 02 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,403 $9,820 Not Implemented
SF0042 # 03 Y:1994 03 1994 TURN OFF EQUIPMENT WHEN NOT IN USE $1,004 $0 Implemented
SF0042 # 04 Y:1994 04 1994 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $8,759 $1,349 Not Implemented
SF0042 # 02 Y:1994 02 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,820 $10,676 Implemented
SF0042 # 05 Y:1994 05 1994 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $440 $68 Implemented
SF0042 # 01 Y:1994 01 1994 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,464 $1,647 Implemented
SF0041 # 04 Y:1994 04 1994 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,038 $900 Implemented
SF0041 # 03 Y:1994 03 1994 INSTALL OCCUPANCY SENSORS $5,661 $4,920 Implemented