Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
469
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
CI0023 # 03 Y:2023 | 03 | 2023 | REPLACE BOILER | $13,894 | $30,000 | n/a |
CI0023 # 01 Y:2023 | 01 | 2023 | USE SOLAR HEAT TO MAKE ELECTRICTY | $78,738 | $658,288 | n/a |
CI0023 # 04 Y:2023 | 04 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $7,902 | $300 | n/a |
CI0023 # 05 Y:2023 | 05 | 2023 | INSTALL OCCUPANCY SENSORS | $7,791 | $2,625 | n/a |
SF0609 # 05 Y:2023 | 05 | 2023 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $32,617 | $36,367 | n/a |
SF0609 # 06 Y:2023 | 06 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $56,467 | $66,447 | n/a |
SF0609 # 09 Y:2023 | 09 | 2023 | INSTALL WIND POWERED ELECTRIC GENERATOR | $426,217 | $1,338,900 | n/a |
CI0023 # 07 Y:2023 | 07 | 2023 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $5,670 | $7,500 | n/a |
CI0023 # 09 Y:2023 | 09 | 2023 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $2,250 | $13,000 | n/a |
CI0023 # 08 Y:2023 | 08 | 2023 | RECOVER WASTE HEAT FROM EQUIPMENT | $3,797 | $5,000 | n/a |
SJ0008 # 04 Y:2023 | 04 | 2023 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $126 | $436 | Not Implemented |
SJ0008 # 03 Y:2023 | 03 | 2023 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $80 | $0 | Not Implemented |
SJ0008 # 05 Y:2023 | 05 | 2023 | INSULATE BARE EQUIPMENT | $265 | $344 | Implemented |
SJ0008 # 02 Y:2023 | 02 | 2023 | TURN OFF EQUIPMENT WHEN NOT IN USE | $365 | $0 | Implemented |
SJ0008 # 01 Y:2023 | 01 | 2023 | USE SOLAR HEAT TO MAKE ELECTRICTY | $13,195 | $77,365 | Not Implemented |
SJ0008 # 06 Y:2023 | 06 | 2023 | INSTALL OCCUPANCY SENSORS | $78 | $177 | Not Implemented |
SF0608 # 03 Y:2023 | 03 | 2023 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $29,842 | $690 | n/a |
SF0608 # 09 Y:2023 | 09 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $14,376 | $15,156 | n/a |
SF0608 # 01 Y:2023 | 01 | 2023 | CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE | $16,747 | $400 | n/a |
SF0608 # 02 Y:2023 | 02 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $8,322 | $0 | n/a |
SF0608 # 05 Y:2023 | 05 | 2023 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $11,235 | $4,654 | n/a |
SF0608 # 08 Y:2023 | 08 | 2023 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $39,597 | $29,794 | n/a |
SF0608 # 11 Y:2023 | 11 | 2023 | USE SOLAR HEAT TO MAKE ELECTRICTY | $326,216 | $2,215,771 | n/a |
SF0608 # 07 Y:2023 | 07 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $71,828 | $51,150 | n/a |
SF0608 # 10 Y:2023 | 10 | 2023 | INSTALL OCCUPANCY SENSORS | $15,936 | $78,007 | n/a |