Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
10,136
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UD1121 # 01 Y:2025 | 01 | 2025 | REPLACE BOILER | $2,668 | $50,000 | n/a |
UD1120 # 02 Y:2025 | 02 | 2025 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $861 | $2,000 | n/a |
WV0688 # 06 Y:2025 | 06 | 2025 | USE EVAPORATION TO CONCENTRATE MATERIAL | $4,913 | $21,336 | n/a |
WV0688 # 05 Y:2025 | 05 | 2025 | UPGRADE CONTROLS ON COMPRESSORS | $5,215 | $5,557 | n/a |
WV0688 # 07 Y:2025 | 07 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $4,391 | $10,040 | n/a |
UD1120 # 06 Y:2025 | 06 | 2025 | KEEP EQUIPMENT CLEAN | $969 | $500 | n/a |
WV0688 # 12 Y:2025 | 12 | 2025 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $203 | $673 | n/a |
WV0688 # 09 Y:2025 | 09 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,242 | $743 | n/a |
WV0688 # 08 Y:2025 | 08 | 2025 | ESTABLISH A PREVENTATIVE MAINTENANCE PROGRAM | $1,612 | $1,500 | n/a |
WV0688 # 03 Y:2025 | 03 | 2025 | INSTALL OCCUPANCY SENSORS | $9,267 | $13,716 | n/a |
UD1120 # 05 Y:2025 | 05 | 2025 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $630 | $30,000 | n/a |
UD1120 # 04 Y:2025 | 04 | 2025 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $120 | $300 | n/a |
WV0688 # 01 Y:2025 | 01 | 2025 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $18,599 | $24,000 | n/a |
UD1120 # 07 Y:2025 | 07 | 2025 | USE SOLAR HEAT TO MAKE ELECTRICTY | $13,285 | $224,000 | n/a |
WV0688 # 11 Y:2025 | 11 | 2025 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $245 | $70 | n/a |
WV0688 # 10 Y:2025 | 10 | 2025 | DEVELOP A REPAIR/REPLACE POLICY | $1,229 | $5,827 | n/a |
UD1120 # 03 Y:2025 | 03 | 2025 | USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS | $767 | $10,000 | n/a |
WV0688 # 02 Y:2025 | 02 | 2025 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $10,123 | $9,580 | n/a |
WV0688 # 04 Y:2025 | 04 | 2025 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $6,295 | $24,800 | n/a |
UD1120 # 01 Y:2025 | 01 | 2025 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $1,599 | $2,000 | n/a |
UD1116 # 02 Y:2025 | 02 | 2025 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $9,462 | $15,035 | n/a |
UD1116 # 04 Y:2025 | 04 | 2025 | CENTRALIZE CONTROL OF EXHAUST FANS TO ENSURE THEIR SHUTDOWN, OR ESTABLISH PROGRAM TO ENSURE MANUAL SHUTDOWN | $2,842 | $908 | n/a |
UD1116 # 05 Y:2025 | 05 | 2025 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $251 | $0 | n/a |
UD1116 # 03 Y:2025 | 03 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $4,126 | $5,813 | n/a |
UD1116 # 01 Y:2025 | 01 | 2025 | TURN OFF EQUIPMENT WHEN NOT IN USE | $1,791 | $0 | n/a |