IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,746

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
CO0014 # 03 Y:1984 03 1984 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $74 $135 Implemented
KU0148 # 01 Y:1984 01 1984 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,910 $36 Implemented
KU0149 # 09 Y:1984 09 1984 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,551 $300 Implemented
KU0149 # 06 Y:1984 06 1984 INSULATE BARE EQUIPMENT $480 $325 Not Implemented
CO0015 # 05 Y:1984 05 1984 INSTALL TIMERS AND/OR THERMOSTATS $5,808 $4,000 Not Implemented
CO0015 # 06 Y:1984 06 1984 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $791 $230 Implemented
CO0014 # 04 Y:1984 04 1984 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $730 $2,500 Not Implemented
CO0015 # 11 Y:1984 11 1984 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $335 $250 Implemented
CO0015 # 12 Y:1984 12 1984 UTILIZE AN EVAPORATIVE AIR PRE-COOLER OR OTHER HEAT EXCHANGER IN AC SYSTEM $1,237 $3,000 Not Implemented
CO0015 # 01 Y:1984 01 1984 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $963 $908 Implemented
GT0237 # 01 Y:1984 01 1984 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $7,160 $2,000 Not Implemented
CO0015 # 02 Y:1984 02 1984 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $300 $300 Implemented
KU0149 # 13 Y:1984 13 1984 UTILIZE OUTSIDE AIR INSTEAD OF CONDITIONED AIR FOR DRYING $911 $820 Implemented
KU0149 # 15 Y:1984 15 1984 INSULATE BARE EQUIPMENT $834 $40 Not Implemented
KU0148 # 13 Y:1984 13 1984 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $1,182 $2,000 Implemented
GT0237 # 03 Y:1984 03 1984 REPAIR AND ELIMINATE STEAM LEAKS $1,730 $100 Implemented
KU0148 # 07 Y:1984 07 1984 INSULATE BARE EQUIPMENT $1,738 $1,240 Not Implemented
CO0015 # 04 Y:1984 04 1984 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $694 $1,127 Implemented
KU0148 # 14 Y:1984 14 1984 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $760 $0 Implemented
KU0148 # 08 Y:1984 08 1984 RECOVER WASTE HEAT FROM EQUIPMENT $99 $150 Not Implemented
KU0148 # 11 Y:1984 11 1984 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $10,658 $15,000 Not Implemented
KU0148 # 15 Y:1984 15 1984 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $1,508 $1,900 Not Implemented
KU0149 # 10 Y:1984 10 1984 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $586 $300 Implemented
KU0148 # 04 Y:1984 04 1984 INSTALL AUTOMATIC STACK DAMPER $436 $700 Implemented
KU0149 # 04 Y:1984 04 1984 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,550 $75 Not Implemented