Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
1,746
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
CO0014 # 03 Y:1984 | 03 | 1984 | INSTALL / REPAIR INSULATION ON CONDENSATE LINES | $74 | $135 | Implemented |
KU0148 # 01 Y:1984 | 01 | 1984 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,910 | $36 | Implemented |
KU0149 # 09 Y:1984 | 09 | 1984 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,551 | $300 | Implemented |
KU0149 # 06 Y:1984 | 06 | 1984 | INSULATE BARE EQUIPMENT | $480 | $325 | Not Implemented |
CO0015 # 05 Y:1984 | 05 | 1984 | INSTALL TIMERS AND/OR THERMOSTATS | $5,808 | $4,000 | Not Implemented |
CO0015 # 06 Y:1984 | 06 | 1984 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $791 | $230 | Implemented |
CO0014 # 04 Y:1984 | 04 | 1984 | RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR | $730 | $2,500 | Not Implemented |
CO0015 # 11 Y:1984 | 11 | 1984 | REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES | $335 | $250 | Implemented |
CO0015 # 12 Y:1984 | 12 | 1984 | UTILIZE AN EVAPORATIVE AIR PRE-COOLER OR OTHER HEAT EXCHANGER IN AC SYSTEM | $1,237 | $3,000 | Not Implemented |
CO0015 # 01 Y:1984 | 01 | 1984 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $963 | $908 | Implemented |
GT0237 # 01 Y:1984 | 01 | 1984 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $7,160 | $2,000 | Not Implemented |
CO0015 # 02 Y:1984 | 02 | 1984 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $300 | $300 | Implemented |
KU0149 # 13 Y:1984 | 13 | 1984 | UTILIZE OUTSIDE AIR INSTEAD OF CONDITIONED AIR FOR DRYING | $911 | $820 | Implemented |
KU0149 # 15 Y:1984 | 15 | 1984 | INSULATE BARE EQUIPMENT | $834 | $40 | Not Implemented |
KU0148 # 13 Y:1984 | 13 | 1984 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $1,182 | $2,000 | Implemented |
GT0237 # 03 Y:1984 | 03 | 1984 | REPAIR AND ELIMINATE STEAM LEAKS | $1,730 | $100 | Implemented |
KU0148 # 07 Y:1984 | 07 | 1984 | INSULATE BARE EQUIPMENT | $1,738 | $1,240 | Not Implemented |
CO0015 # 04 Y:1984 | 04 | 1984 | USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE | $694 | $1,127 | Implemented |
KU0148 # 14 Y:1984 | 14 | 1984 | REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED | $760 | $0 | Implemented |
KU0148 # 08 Y:1984 | 08 | 1984 | RECOVER WASTE HEAT FROM EQUIPMENT | $99 | $150 | Not Implemented |
KU0148 # 11 Y:1984 | 11 | 1984 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $10,658 | $15,000 | Not Implemented |
KU0148 # 15 Y:1984 | 15 | 1984 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $1,508 | $1,900 | Not Implemented |
KU0149 # 10 Y:1984 | 10 | 1984 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $586 | $300 | Implemented |
KU0148 # 04 Y:1984 | 04 | 1984 | INSTALL AUTOMATIC STACK DAMPER | $436 | $700 | Implemented |
KU0149 # 04 Y:1984 | 04 | 1984 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $2,550 | $75 | Not Implemented |