Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
143,385
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UD1119 # 06 Y:2025 | 06 | 2025 | USE HEAT PUMP FOR SPACE CONDITIONING | $24,495 | $100,000 | n/a |
OK1143 # 06 Y:2025 | 06 | 2025 | OPTIMIZE PLANT POWER FACTOR | $1,479 | $2,457 | n/a |
OK1143 # 04 Y:2025 | 04 | 2025 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $609 | $4,675 | n/a |
OK1143 # 03 Y:2025 | 03 | 2025 | INSTALL TIMERS AND/OR THERMOSTATS | $1,973 | $1,950 | n/a |
OK1143 # 05 Y:2025 | 05 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,910 | $4,426 | n/a |
UD1119 # 01 Y:2025 | 01 | 2025 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $8,511 | $40,000 | n/a |
UD1119 # 05 Y:2025 | 05 | 2025 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $649 | $6,400 | n/a |
UW2509 # 03 Y:2025 | 03 | 2025 | INSTALL OCCUPANCY SENSORS | $6,569 | $12,849 | n/a |
UW2509 # 04 Y:2025 | 04 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $8,643 | $25,000 | n/a |
UW2509 # 01 Y:2025 | 01 | 2025 | USE SOLAR HEAT TO MAKE ELECTRICTY | $130,385 | $1,125,377 | n/a |
UW2509 # 02 Y:2025 | 02 | 2025 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,759 | $18,648 | n/a |
WV0686 # 06 Y:2025 | 06 | 2025 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $814 | $894 | n/a |
WV0686 # 02 Y:2025 | 02 | 2025 | USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR | $2,427 | $11,850 | n/a |
WV0686 # 05 Y:2025 | 05 | 2025 | INSULATE BARE EQUIPMENT | $964 | $412 | n/a |
WV0686 # 01 Y:2025 | 01 | 2025 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,920 | $1,550 | n/a |
WV0686 # 03 Y:2025 | 03 | 2025 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $2,393 | $9,261 | n/a |
WV0686 # 04 Y:2025 | 04 | 2025 | INSTALL SET-BACK TIMERS | $1,875 | $1,135 | n/a |
WV0686 # 07 Y:2025 | 07 | 2025 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $247 | $108 | n/a |
UD1115 # 03 Y:2025 | 03 | 2025 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $1,016 | $760 | n/a |
UD1115 # 01 Y:2025 | 01 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $25,515 | $7,035 | n/a |
UD1115 # 04 Y:2025 | 04 | 2025 | INSULATE BARE EQUIPMENT | $892 | $1,267 | n/a |
UD1115 # 06 Y:2025 | 06 | 2025 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,479 | $1,015 | n/a |
UD1115 # 05 Y:2025 | 05 | 2025 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,587 | $5,423 | n/a |
UD1115 # 02 Y:2025 | 02 | 2025 | OPTIMIZE PLANT POWER FACTOR | $2,927 | $3,700 | n/a |
WV0685 # 01 Y:2025 | 01 | 2025 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $14,445 | $16,580 | n/a |