IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,130

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
GT0516 # 02 Y:1993 02 1993 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $21,340 $72,000 Not Implemented
GT0515 # 05 Y:1993 05 1993 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $48,620 $100,640 Not Implemented
SD0070 # 07 Y:1993 07 1993 INSTALL SET-BACK TIMERS $1,719 $3,360 Implemented
GT0515 # 04 Y:1993 04 1993 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $4,260 $14,500 Not Implemented
GT0515 # 07 Y:1993 07 1993 SUBSTITUTE COMPRESSED AIR COOLING WITH WATER OR AIR COOLING $8,650 $6,560 Not Implemented
GT0515 # 08 Y:1993 08 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $41,820 $80,090 Implemented
GT0516 # 01 Y:1993 01 1993 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,280 $0 Not Implemented
SD0070 # 06 Y:1993 06 1993 INSTALL SPECTRAL REFLECTORS / DELAMP $7,258 $7,590 Implemented
SD0070 # 05 Y:1993 05 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $680 $1,041 Implemented
GT0515 # 01 Y:1993 01 1993 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $4,130 $9,570 Not Implemented
GT0515 # 03 Y:1993 03 1993 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $680 $500 Implemented
GT0516 # 03 Y:1993 03 1993 ENHANCE SENSITIVITY OF TEMPERATURE CONTROL AND CUTOFF $72,000 $40,000 Not Implemented
SD0070 # 03 Y:1993 03 1993 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $19,419 $200 Implemented
GT0516 # 04 Y:1993 04 1993 USE SYNTHETIC LUBRICANT $39,000 $0 Not Implemented
GT0515 # 02 Y:1993 02 1993 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,090 $0 Not Implemented
SD0070 # 08 Y:1993 08 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,052 $735 Implemented
AR0015 # 04 Y:1993 04 1993 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $5,187 $14,712 Not Implemented
AR0015 # 05 Y:1993 05 1993 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $18,409 $5,000 Not Implemented
AR0015 # 01 Y:1993 01 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $12,666 $740 Not Implemented
AR0015 # 06 Y:1993 06 1993 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $25,253 $12,000 Not Implemented
AR0015 # 03 Y:1993 03 1993 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,562 $1,000 Implemented
AR0015 # 02 Y:1993 02 1993 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $14,046 $6,750 Not Implemented
UD0420 # 05 Y:1993 05 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,048 $2,456 Implemented
UD0420 # 07 Y:1993 07 1993 CHANGE PRODUCT DESIGN TO REDUCE ENERGY REQUIREMENTS $26,098 $0 Not Implemented
UD0420 # 04 Y:1993 04 1993 USE DEMAND CONTROLLER OR LOAD SHEDDER $1,840 $0 Not Implemented