IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,520

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TN0652 # 04 Y:1999 04 1999 MODIFY CURRENT INCENTIVE PROGRAM $18,000 $49,200 Implemented
TN0652 # 09 Y:1999 09 1999 REPAIR AND ELIMINATE STEAM LEAKS $28,970 $300 Not Implemented
TN0652 # 03 Y:1999 03 1999 RECOVER AND REUSE WASTE MATERIAL $23,000 $60,500 Implemented
TN0652 # 10 Y:1999 10 1999 INSTALL SMALLER BOILER (INCREASE HIGH FIRE DUTY CYCLE) $16,210 $10,000 Not Implemented
TN0652 # 02 Y:1999 02 1999 MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION $34,710 $27,240 Not Implemented
TN0652 # 06 Y:1999 06 1999 REPAIR AND ELIMINATE STEAM LEAKS $4,000 $100 Implemented
TN0652 # 01 Y:1999 01 1999 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $189,625 $28,000 Implemented
OD0150 # 02 Y:1999 02 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $370 $400 Not Implemented
OD0150 # 05 Y:1999 05 1999 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $779 $0 Not Implemented
OD0150 # 04 Y:1999 04 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $611 $3,660 Not Implemented
OD0150 # 03 Y:1999 03 1999 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $402 $20 Not Implemented
OD0150 # 01 Y:1999 01 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,354 $9,564 Not Implemented
GT0678 # 05 Y:1999 05 1999 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $8,447 $21,000 Not Implemented
GT0678 # 06 Y:1999 06 1999 TREAT AND REUSE EQUIPMENT CLEANING SOLUTIONS $35,980 $0 Implemented
GT0678 # 02 Y:1999 02 1999 REDUCE EXCESSIVE BOILER BLOWDOWN $920 $900 Not Implemented
GT0678 # 07 Y:1999 07 1999 USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR $44,185 $120,000 Not Implemented
GT0678 # 08 Y:1999 08 1999 COMBINE UTILITY METERS $7,560 $7,500 Not Implemented
GT0678 # 04 Y:1999 04 1999 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,400 $0 Not Implemented
GT0678 # 01 Y:1999 01 1999 METER WASTE WATER $4,925 $900 Implemented
GT0678 # 03 Y:1999 03 1999 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $4,880 $3,500 Not Implemented
TN0650 # 04 Y:1999 04 1999 INSULATE BARE EQUIPMENT $6,220 $2,180 Not Implemented
TN0650 # 03 Y:1999 03 1999 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $8,150 $0 Implemented
TN0650 # 02 Y:1999 02 1999 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $8,400 $0 Implemented
TN0650 # 01 Y:1999 01 1999 MODIFY CURRENT INCENTIVE PROGRAM $150,000 $30,000 Not Implemented
TN0650 # 05 Y:1999 05 1999 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $6,350 $36,000 Not Implemented