IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,533

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UF0371 # 08 Y:2005 08 2005 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $3,385 $0 Implemented
UF0371 # 12 Y:2005 12 2005 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS $100,000 $25,000 Implemented
UF0371 # 09 Y:2005 09 2005 LOWER CEILING TO REDUCE CONDITIONED SPACE $5,477 $800 Implemented
UF0371 # 03 Y:2005 03 2005 LOWER LIGHT FIXTURES IN HIGH CEILING AREAS $6,271 $1,680 Implemented
UF0371 # 05 Y:2005 05 2005 INSTALL OCCUPANCY SENSORS $2,952 $4,688 Not Implemented
UF0371 # 01 Y:2005 01 2005 LOWER CEILING TO REDUCE CONDITIONED SPACE $6,120 $978 Implemented
UF0371 # 02 Y:2005 02 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,368 $650 Implemented
MS0286 # 01 Y:2005 01 2005 AIR CONDITION ONLY SPACE NECESSARY $6,625 $0 Not Implemented
AM0499 # 09 Y:2005 09 2005 USE OPTIMUM THICKNESS INSULATION $505 $35 Not Implemented
AM0499 # 07 Y:2005 07 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,380 $1,080 Not Implemented
AM0499 # 04 Y:2005 04 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $11,110 $2,800 Implemented
AM0499 # 10 Y:2005 10 2005 USE OPTIMUM THICKNESS INSULATION $270 $40 Not Implemented
AM0499 # 03 Y:2005 03 2005 USE SYNTHETIC LUBRICANT $11,335 $0 Implemented
AM0499 # 08 Y:2005 08 2005 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $735 $0 Implemented
AM0499 # 05 Y:2005 05 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,975 $0 Implemented
AM0499 # 02 Y:2005 02 2005 REUSE RAGS UNTIL COMPLETELY SOILED $12,000 $0 Implemented
AM0499 # 01 Y:2005 01 2005 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $12,800 $27,700 Implemented
AM0499 # 06 Y:2005 06 2005 OPTIMIZE PLANT POWER FACTOR $2,270 $5,600 Not Implemented
GT0815 # 04 Y:2005 04 2005 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $40,800 $110,000 Not Implemented
UM0294 # 02 Y:2005 02 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,274 $600 Not Implemented
GT0815 # 02 Y:2005 02 2005 REPLACE HEAT TREATING OVEN WITH MORE EFFICIENT UNIT $84,900 $37,500 Not Implemented
GT0815 # 06 Y:2005 06 2005 USE SYNTHETIC LUBRICANT $4,865 $0 Implemented
GT0815 # 05 Y:2005 05 2005 ESTABLISH BURNER MAINTENANCE SCHEDULE FOR BOILERS $4,041 $1,500 Not Implemented
GT0815 # 01 Y:2005 01 2005 RECOVER WASTE HEAT FROM EQUIPMENT $116,700 $90,000 Not Implemented
GT0815 # 03 Y:2005 03 2005 ADJUST BURNERS FOR EFFICIENT OPERATION $62,800 $36,000 Not Implemented