Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
1,449
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UU0272 # 05 Y:2025 | 05 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $9,950 | $23,600 | n/a |
UU0272 # 02 Y:2025 | 02 | 2025 | INSULATE BARE EQUIPMENT | $31,500 | $18,800 | n/a |
UU0272 # 04 Y:2025 | 04 | 2025 | USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER | $54,700 | $110,000 | n/a |
UU0272 # 07 Y:2025 | 07 | 2025 | REPAIR AND ELIMINATE STEAM LEAKS | $62,900 | $32,400 | n/a |
UU0272 # 09 Y:2025 | 09 | 2025 | USE SOLAR HEAT TO MAKE ELECTRICTY | $18,600 | $207,000 | n/a |
UU0272 # 10 Y:2025 | 10 | 2025 | PAY BILLS ON TIME TO AVOID LATE FEES | $1,500 | $600 | n/a |
UU0272 # 03 Y:2025 | 03 | 2025 | REDUCE EXCESSIVE BOILER BLOWDOWN | $20,800 | $16,300 | n/a |
UU0272 # 11 Y:2025 | 11 | 2025 | OPTIMIZE PLANT POWER FACTOR | $1,250 | $11,200 | n/a |
UU0272 # 01 Y:2025 | 01 | 2025 | Hire Energy Manager | $66,000 | $13,000 | n/a |
UU0272 # 08 Y:2025 | 08 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $890 | $410 | n/a |
DL0257 # 04 Y:2025 | 04 | 2025 | USE OPTIMUM TEMPERATURE | $1,329 | $0 | n/a |
LS0625 # 05 Y:2025 | 05 | 2025 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,623 | $6,769 | n/a |
LS0625 # 03 Y:2025 | 03 | 2025 | CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS | $1,618 | $1,190 | n/a |
IC0326 # 07 Y:2025 | 07 | 2025 | INSULATE BARE EQUIPMENT | $2,266 | $2,982 | n/a |
IC0326 # 04 Y:2025 | 04 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,819 | $678 | n/a |
DL0257 # 03 Y:2025 | 03 | 2025 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $343 | $0 | n/a |
DL0257 # 02 Y:2025 | 02 | 2025 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $4,000 | $0 | n/a |
DL0257 # 05 Y:2025 | 05 | 2025 | INSTALL TIMERS AND/OR THERMOSTATS | $291 | $131 | n/a |
IC0326 # 05 Y:2025 | 05 | 2025 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $393 | $1,089 | n/a |
IC0326 # 01 Y:2025 | 01 | 2025 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $9,345 | $13,327 | n/a |
IC0326 # 08 Y:2025 | 08 | 2025 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $15,398 | $114,881 | n/a |
LS0625 # 04 Y:2025 | 04 | 2025 | REDUCE HEAT GAIN BY WINDOW TINTING | $1,068 | $1,428 | n/a |
IC0326 # 06 Y:2025 | 06 | 2025 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $657 | $3,632 | n/a |
LS0625 # 06 Y:2025 | 06 | 2025 | REPLACE HEAT TREATING OVEN WITH MORE EFFICIENT UNIT | $1,754 | $5,000 | n/a |
LS0625 # 02 Y:2025 | 02 | 2025 | INSTALL OCCUPANCY SENSORS | $2,773 | $625 | n/a |