IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,707

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IA0340 # 06 Y:2004 06 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,946 $135 Implemented
IA0340 # 07 Y:2004 07 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,093 $4,412 Not Implemented
IA0340 # 08 Y:2004 08 2004 INSTALL OCCUPANCY SENSORS $787 $1,397 Not Implemented
IA0340 # 09 Y:2004 09 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,397 $1,494 Not Implemented
IA0340 # 10 Y:2004 10 2004 USE SCREENING, MAGNETIC SEPARATION TO REMOVE CONTAMINANTS $12,424 $12,000 Not Implemented
IA0340 # 11 Y:2004 11 2004 INSTALL AUTOMATIC PART STORAGE / RETREVAL SYSTEM $16,000 $36,000 Implemented
IA0339 # 01 Y:2004 01 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $658 $50 Implemented
IA0339 # 02 Y:2004 02 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,295 $1,101 Implemented
IA0339 # 03 Y:2004 03 2004 RECOVER WASTE HEAT FROM EQUIPMENT $3,008 $540 Not Implemented
IA0339 # 04 Y:2004 04 2004 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,524 $1,430 Implemented
IA0339 # 05 Y:2004 05 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,060 $3,135 Implemented
IA0339 # 06 Y:2004 06 2004 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $3,825 $1,000 Implemented
IA0339 # 07 Y:2004 07 2004 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $10,005 $75,600 Not Implemented
IA0335 # 01 Y:2004 01 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,405 $25 Not Implemented
IA0335 # 02 Y:2004 02 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,625 $474 Implemented
IA0335 # 03 Y:2004 03 2004 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $886 $866 Implemented
IA0335 # 04 Y:2004 04 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,387 $6,232 Implemented
IA0335 # 05 Y:2004 05 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,647 $3,807 Implemented
IA0335 # 06 Y:2004 06 2004 INSTALL OCCUPANCY SENSORS $918 $1,729 Not Implemented
IA0335 # 07 Y:2004 07 2004 INSULATE BARE EQUIPMENT $11,767 $12,275 Implemented
IA0335 # 08 Y:2004 08 2004 INSULATE BARE EQUIPMENT $8,410 $6,902 Not Implemented
IA0335 # 09 Y:2004 09 2004 INSULATE BARE EQUIPMENT $1,097 $198 Not Implemented
IA0330 # 01 Y:2003 01 2003 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,889 $1,000 Not Implemented
IA0330 # 02 Y:2003 02 2003 DIRECT WARMEST AIR TO COMBUSTION INTAKE $916 $1,734 Not Implemented
IA0330 # 03 Y:2003 03 2003 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT INCOMING FLUIDS $34,175 $36,000 Not Implemented