IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,230

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MAS013 # 07 Y:2011 07 2011 TURN OFF STEAM / HOT WATER LINES LEADING TO SPACE HEATING UNITS $2,115 $150 Implemented
MAS013 # 08 Y:2011 08 2011 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $942 $5,000 Not Implemented
MAS013 # 09 Y:2011 09 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $784 $3,500 Implemented
BD0396 # 01 Y:2011 01 2011 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $72,574 $19,000 Not Implemented
BD0396 # 02 Y:2011 02 2011 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES $26,133 $39,000 Not Implemented
BD0396 # 03 Y:2011 03 2011 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $18,092 $30,000 Not Implemented
BD0396 # 04 Y:2011 04 2011 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $10,736 $20,080 Not Implemented
BD0396 # 05 Y:2011 05 2011 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR $6,576 $300 Not Implemented
BD0396 # 06 Y:2011 06 2011 INSTALL OCCUPANCY SENSORS $3,890 $4,200 Not Implemented
BD0396 # 07 Y:2011 07 2011 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $4,851 $600 Not Implemented
NC0435 # 01 Y:2011 01 2011 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $23,638 $0 Not Implemented
NC0435 # 02 Y:2011 02 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $44,479 $72,211 Implemented
NC0435 # 03 Y:2011 03 2011 INSTALL SPECTRAL REFLECTORS / DELAMP $1,887 $7,760 Implemented
NC0435 # 04 Y:2011 04 2011 INSTALL OCCUPANCY SENSORS $661 $1,911 Implemented
NC0435 # 05 Y:2011 05 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $124 $31 Not Implemented
NC0435 # 06 Y:2011 06 2011 INSTALL TIMERS AND/OR THERMOSTATS $295 $1,500 Implemented
MZ0070 # 01 Y:2011 01 2011 RECOVER WASTE HEAT FROM EQUIPMENT $1,076 $800 Implemented
MZ0070 # 02 Y:2011 02 2011 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,693 $920 Implemented
MZ0070 # 03 Y:2011 03 2011 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $1,071 $1,122 Implemented
MZ0070 # 04 Y:2011 04 2011 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $2,769 $360 Implemented
MZ0070 # 05 Y:2011 05 2011 RECOVER WASTE HEAT FROM EQUIPMENT $40,140 $10,000 Implemented
MZ0070 # 06 Y:2011 06 2011 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $209 $200 Not Implemented
MZ0070 # 07 Y:2011 07 2011 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $21,157 $16,730 Not Implemented
IA0472 # 01 Y:2011 01 2011 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $3,238 $9,000 Not Implemented
IA0472 # 02 Y:2011 02 2011 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $18,811 $15,000 Not Implemented