IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,754

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK0147 # 03 Y:1984 03 1984 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,650 $6,252 Implemented
OK0147 # 04 Y:1984 04 1984 HEAT WATER WITH EXHAUST HEAT $7,174 $6,955 Not Implemented
OK0147 # 05 Y:1984 05 1984 USE DEMAND CONTROLLER OR LOAD SHEDDER $6,120 $1,236 Implemented
OK0147 # 06 Y:1984 06 1984 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $566 $333 Implemented
OK0147 # 07 Y:1984 07 1984 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $2,671 $1,647 Implemented
OK0147 # 08 Y:1984 08 1984 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $2,036 $720 Implemented
OK0147 # 09 Y:1984 09 1984 INSTALL TIMERS AND/OR THERMOSTATS $492 $291 Implemented
OK0147 # 10 Y:1984 10 1984 TURN OFF EQUIPMENT WHEN NOT IN USE $6,362 $1,090 Implemented
OK0149 # 01 Y:1984 01 1984 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $363 $650 Implemented
OK0149 # 02 Y:1984 02 1984 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $3,221 $2,000 Not Implemented
OK0149 # 03 Y:1984 03 1984 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $351 $220 Implemented
OK0149 # 04 Y:1984 04 1984 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $625 $1,700 Implemented
OK0149 # 05 Y:1984 05 1984 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $360 $104 Implemented
OK0149 # 06 Y:1984 06 1984 INSTALL / REPAIR INSULATION ON STEAM LINES $3,556 $785 Implemented
OK0149 # 07 Y:1984 07 1984 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $126 $235 Implemented
OK0149 # 08 Y:1984 08 1984 INSULATE BARE EQUIPMENT $155 $235 Implemented
OK0149 # 09 Y:1984 09 1984 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $826 $0 Implemented
OK0149 # 10 Y:1984 10 1984 USE DEMAND CONTROLLER OR LOAD SHEDDER $2,537 $480 Implemented
OK0150 # 01 Y:1984 01 1984 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $320 $450 Not Implemented
OK0150 # 02 Y:1984 02 1984 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $140 $0 Implemented
OK0150 # 03 Y:1984 03 1984 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $45 $60 Implemented
OK0150 # 04 Y:1984 04 1984 REPAIR AND ELIMINATE STEAM LEAKS $1,250 $180 Implemented
OK0150 # 05 Y:1984 05 1984 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $745 $122 Not Implemented
OK0150 # 06 Y:1984 06 1984 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,460 $1,350 Not Implemented
OK0150 # 07 Y:1984 07 1984 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $60 $50 Implemented