IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

6,403

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WI0263 # 05 Y:1996 05 1996 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $862 $2,000 Implemented
WI0263 # 06 Y:1996 06 1996 RECOVER WASTE HEAT FROM EQUIPMENT $551 $1,000 Not Implemented
WI0263 # 07 Y:1996 07 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,442 $115 Implemented
WI0263 # 08 Y:1996 08 1996 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $241 $640 Implemented
WV0087 # 01 Y:1996 01 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,024 $1,580 Implemented
WV0087 # 02 Y:1996 02 1996 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $327 $160 Implemented
WV0087 # 03 Y:1996 03 1996 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $195 $320 Not Implemented
WV0087 # 04 Y:1996 04 1996 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $825 $300 Implemented
WV0087 # 05 Y:1996 05 1996 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $1,071 $1,467 Not Implemented
WV0087 # 06 Y:1996 06 1996 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $6,158 $12,000 Not Implemented
WV0087 # 07 Y:1996 07 1996 INSULATE BARE EQUIPMENT $7,466 $1,085 Implemented
WV0087 # 08 Y:1996 08 1996 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $82,766 $960 Not Implemented
MS0054 # 01 Y:1996 01 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,116 $10,500 Implemented
MS0054 # 02 Y:1996 02 1996 USE WATER ON AIR CONDITIONING EXCHANGER TO IMPROVE HEAT TRANSFER AND INCREASE AIR CONDITIONER EFFICIENCY $1,213 $5,100 Not Implemented
MS0054 # 03 Y:1996 03 1996 IMPROVE LUBRICATION PRACTICES $1,076 $150 Implemented
MS0054 # 04 Y:1996 04 1996 AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM $2,888 $3,000 Not Implemented
MS0054 # 05 Y:1996 05 1996 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $2,424 $7,000 Not Implemented
MS0054 # 06 Y:1996 06 1996 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $3,866 $0 Not Implemented
MS0054 # 07 Y:1996 07 1996 USE RE-USABLE FILTERS $648 $1,080 Not Implemented
MS0054 # 08 Y:1996 08 1996 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE $3,420 $0 Not Implemented
UF0143 # 01 Y:1996 01 1996 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,556 $750 Implemented
UF0143 # 02 Y:1996 02 1996 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,312 $1,700 Implemented
UF0143 # 03 Y:1996 03 1996 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $12,593 $17,828 Implemented
UF0143 # 04 Y:1996 04 1996 REDUCE DELIVERY SCHEDULES $1,550 $0 Implemented
UF0143 # 05 Y:1996 05 1996 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $865,200 $68,400 Not Implemented