IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,394

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SU0174 # 01 Y:2004 01 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,108 $0 Implemented
SU0174 # 02 Y:2004 02 2004 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS $58,500 $16,260 Implemented
SU0174 # 03 Y:2004 03 2004 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $85 $45 Implemented
SU0174 # 04 Y:2004 04 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,102 $13,384 Implemented
SU0174 # 05 Y:2004 05 2004 USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR $13,639 $14,240 Implemented
SU0174 # 06 Y:2004 06 2004 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $2,489 $10,360 Implemented
TA0068 # 01 Y:2004 01 2004 REDUCE SCRAP PRODUCTION $400,000 $8,000 Implemented
TA0068 # 02 Y:2004 02 2004 MODIFY PROCESS TO REDUCE MATERIAL USE/COST $82,002 $12,000 Implemented
TA0068 # 03 Y:2004 03 2004 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $32,648 $6,515 Not Implemented
TA0068 # 04 Y:2004 04 2004 MINIMIZE CONTAMINATION OF WATER BEFORE TREATMENT $31,311 $62,000 Not Implemented
TA0068 # 05 Y:2004 05 2004 INSTALL / REPAIR INSULATION ON STEAM LINES $13,130 $3,258 Implemented
TA0068 # 06 Y:2004 06 2004 ELIMINATE LEAKS IN WATER LINES AND VALVES $9,955 $14,400 Implemented
TA0068 # 07 Y:2004 07 2004 REPAIR AND ELIMINATE STEAM LEAKS $4,450 $420 Implemented
TA0068 # 08 Y:2004 08 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,017 $126 Implemented
OR0450 # 01 Y:2004 01 2004 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $22,700 $10,000 Implemented
OR0450 # 02 Y:2004 02 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,300 $0 Implemented
OR0450 # 03 Y:2004 03 2004 TURN OFF EQUIPMENT WHEN NOT IN USE $6,880 $0 Implemented
OR0450 # 04 Y:2004 04 2004 INSULATE BARE EQUIPMENT $8,330 $14,250 Not Implemented
OR0450 # 05 Y:2004 05 2004 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $3,000 $3,400 Implemented
GT0775 # 01 Y:2004 01 2004 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $2,720 $1,559 Implemented
GT0775 # 02 Y:2004 02 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,360 $850 Implemented
GT0775 # 03 Y:2004 03 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $418 $1,559 Not Implemented
GT0775 # 04 Y:2004 04 2004 INSULATE BARE EQUIPMENT $535 $655 Not Implemented
GT0775 # 05 Y:2004 05 2004 UPGRADE OBSOLETE EQUIPMENT $793 $504 Implemented
GT0775 # 06 Y:2004 06 2004 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $296 $980 Implemented