IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,644

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0048 # 01 Y:1995 01 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,912 $3,173 Implemented
WV0048 # 02 Y:1995 02 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $163 $200 Not Implemented
WV0048 # 03 Y:1995 03 1995 USE SYNTHETIC LUBRICANT $150 $0 Not Implemented
WV0048 # 04 Y:1995 04 1995 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $278 $110 Not Implemented
WV0048 # 05 Y:1995 05 1995 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $6,410 $2,900 Implemented
WV0048 # 06 Y:1995 06 1995 INSULATE BARE EQUIPMENT $78 $91 Not Implemented
WV0045 # 01 Y:1994 01 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $530 $740 Implemented
WV0045 # 02 Y:1994 02 1994 MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE $2,284 $960 Not Implemented
WV0045 # 03 Y:1994 03 1994 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $4,030 $4,400 Not Implemented
WV0045 # 04 Y:1994 04 1994 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $2,270 $960 Implemented
WV0045 # 05 Y:1994 05 1994 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $960 $18 Implemented
WV0045 # 06 Y:1994 06 1994 USE SYNTHETIC LUBRICANT $156 $0 Not Implemented
WV0045 # 07 Y:1994 07 1994 INSTALL TIMERS AND/OR THERMOSTATS $1,511 $900 Implemented
HO0087 # 01 Y:1994 01 1994 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $970 $1,428 Implemented
HO0087 # 02 Y:1994 02 1994 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $142 $200 Not Implemented
HO0087 # 03 Y:1994 03 1994 INSULATE BARE EQUIPMENT $4,745 $1,700 Not Implemented
HO0087 # 04 Y:1994 04 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,897 $9,097 Implemented
HO0086 # 01 Y:1994 01 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,339 $2,989 Not Implemented
HO0086 # 02 Y:1994 02 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,316 $4,768 Not Implemented
HO0086 # 03 Y:1994 03 1994 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $700 $1,733 Not Implemented
HO0086 # 04 Y:1994 04 1994 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $990 $200 Implemented
WV0042 # 01 Y:1994 01 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,279 $7,375 Implemented
WV0042 # 02 Y:1994 02 1994 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,921 $0 Not Implemented
WV0042 # 03 Y:1994 03 1994 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,094 $1,372 Implemented
WV0042 # 04 Y:1994 04 1994 RECOVER WASTE HEAT FROM EQUIPMENT $3,973 $440 Not Implemented