Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
5,996
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
KG0086 # 06 Y:1997 | 06 | 1997 | USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION | $302 | $3,978 | n/a |
KG0086 # 07 Y:1997 | 07 | 1997 | REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS | $2,530 | $0 | n/a |
KG0086 # 08 Y:1997 | 08 | 1997 | MINIMIZE WATER USAGE | $1,136 | $28 | n/a |
KG0086 # 09 Y:1997 | 09 | 1997 | REPLACE OLD MACHINE WITH NEW AUTOMATIC MULTI-STATION TOOL | $1,247,000 | $1,765 | n/a |
HO0148 # 01 Y:1997 | 01 | 1997 | INSTALL / REPAIR INSULATION ON STEAM LINES | $1,488 | $2,196 | Implemented |
HO0148 # 02 Y:1997 | 02 | 1997 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $6,600 | $250 | Implemented |
HO0148 # 03 Y:1997 | 03 | 1997 | RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS | $9,425 | $5,000 | Implemented |
HO0148 # 04 Y:1997 | 04 | 1997 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $572 | $370 | Not Implemented |
HO0148 # 05 Y:1997 | 05 | 1997 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $2,408 | $2,000 | Not Implemented |
HO0148 # 06 Y:1997 | 06 | 1997 | RECOVERY METALS FROM RINSE WATER(EVAP., ION EXCHANGE, RO, ELECTROLYSIS, ELECTRODIALYSIS) AND REUSE RINSE WATER | $10,000 | $10,000 | Implemented |
HO0148 # 07 Y:1997 | 07 | 1997 | APPLY FOR INVESTMENT INCENTIVES | $8,676 | $100 | Implemented |
WV0110 # 01 Y:1997 | 01 | 1997 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,392 | $309 | Implemented |
WV0110 # 02 Y:1997 | 02 | 1997 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $1,801 | $1,086 | Implemented |
WV0110 # 03 Y:1997 | 03 | 1997 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $194 | $182 | Not Implemented |
WV0110 # 04 Y:1997 | 04 | 1997 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $492 | $120 | Implemented |
WV0110 # 05 Y:1997 | 05 | 1997 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $84 | $0 | Implemented |
WV0110 # 06 Y:1997 | 06 | 1997 | INSULATE BARE EQUIPMENT | $1,974 | $214 | Implemented |
WV0110 # 07 Y:1997 | 07 | 1997 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $1,275 | $1,788 | Implemented |
WV0110 # 08 Y:1997 | 08 | 1997 | RECOVER WASTE HEAT FROM EQUIPMENT | $369 | $900 | Not Implemented |
WV0110 # 09 Y:1997 | 09 | 1997 | USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL | $7,280 | $200 | Not Implemented |
WV0110 # 10 Y:1997 | 10 | 1997 | USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL | $12,480 | $200 | Not Implemented |
WV0110 # 11 Y:1997 | 11 | 1997 | DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS | $400,000 | $112,340 | Not Implemented |
HO0147 # 01 Y:1997 | 01 | 1997 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $163 | $260 | Not Implemented |
HO0147 # 02 Y:1997 | 02 | 1997 | INSULATE BARE EQUIPMENT | $1,474 | $2,500 | Implemented |
HO0147 # 03 Y:1997 | 03 | 1997 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $2,400 | $6,500 | Not Implemented |