Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
6,055
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OD0023 # 05 Y:1995 | 05 | 1995 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $387 | $292 | Implemented |
OD0023 # 06 Y:1995 | 06 | 1995 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $676 | $500 | Implemented |
OD0023 # 07 Y:1995 | 07 | 1995 | INSTALL SMALLER BOILER (INCREASE HIGH FIRE DUTY CYCLE) | $1,061 | $610 | Not Implemented |
KG0018 # 01 Y:1995 | 01 | 1995 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,874 | $699 | Not Implemented |
KG0018 # 02 Y:1995 | 02 | 1995 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $1,356 | $450 | Not Implemented |
KG0018 # 03 Y:1995 | 03 | 1995 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $370 | $0 | Not Implemented |
KG0018 # 04 Y:1995 | 04 | 1995 | INSTALL OCCUPANCY SENSORS | $307 | $195 | Not Implemented |
KG0018 # 05 Y:1995 | 05 | 1995 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $89 | $15 | Not Implemented |
HO0095 # 01 Y:1995 | 01 | 1995 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $7,143 | $3,677 | Not Implemented |
HO0095 # 02 Y:1995 | 02 | 1995 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,588 | $3,686 | Not Implemented |
HO0095 # 03 Y:1995 | 03 | 1995 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $566 | $200 | Not Implemented |
HO0095 # 04 Y:1995 | 04 | 1995 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $33,498 | $121,200 | Not Implemented |
HO0095 # 05 Y:1995 | 05 | 1995 | CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | $9,047 | $1,500 | Not Implemented |
WV0054 # 01 Y:1995 | 01 | 1995 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,021 | $0 | Implemented |
WV0054 # 02 Y:1995 | 02 | 1995 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,161 | $500 | Implemented |
WV0054 # 03 Y:1995 | 03 | 1995 | RECOVER WASTE HEAT FROM EQUIPMENT | $2,306 | $690 | Implemented |
WV0054 # 04 Y:1995 | 04 | 1995 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $10,787 | $1,000 | Implemented |
WV0054 # 05 Y:1995 | 05 | 1995 | USE SYNTHETIC LUBRICANT | $988 | $0 | Implemented |
WV0054 # 06 Y:1995 | 06 | 1995 | MAINTAIN AIR FILTERS BY CLEANING OR REPLACEMENT | $23,617 | $15,458 | Implemented |
WV0054 # 07 Y:1995 | 07 | 1995 | REDUCE SCRAP PRODUCTION | $244,471 | $36,720 | Implemented |
UL0119 # 01 Y:1995 | 01 | 1995 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,280 | $40 | Implemented |
UL0119 # 02 Y:1995 | 02 | 1995 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $477 | $529 | Implemented |
SF0050 # 01 Y:1995 | 01 | 1995 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $48,642 | $166,900 | Implemented |
SF0050 # 02 Y:1995 | 02 | 1995 | OPTIMIZE PLANT POWER FACTOR | $3,578 | $5,911 | Not Implemented |
SF0050 # 03 Y:1995 | 03 | 1995 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $2,230 | $1,125 | Implemented |