IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

7,713

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MI0037 # 03 Y:2002 03 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,361 $120 Implemented
MI0037 # 04 Y:2002 04 2002 MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION $12,505 $1,250 Not Implemented
MI0037 # 05 Y:2002 05 2002 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $2,419 $250 Implemented
MI0037 # 06 Y:2002 06 2002 INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS $7,104 $3,545 Not Implemented
UF0298 # 07 Y:2002 07 2002 USE SOLAR HEAT TO HEAT WATER $149,057 $2,450,000 Not Implemented
UF0298 # 08 Y:2002 08 2002 OPTIMIZE PLANT POWER FACTOR $3,750 $5,000 Not Implemented
UF0298 # 09 Y:2002 09 2002 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $18,976 $50 Implemented
UF0298 # 10 Y:2002 10 2002 RECOVER AND REUSE WASTE MATERIAL $265,592 $500,000 Not Implemented
UF0298 # 11 Y:2002 11 2002 REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS $1,014 $0 Not Implemented
UF0298 # 12 Y:2002 12 2002 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $4,501 $0 Not Implemented
UF0298 # 01 Y:2002 01 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $19,418 $9,500 Not Implemented
UF0298 # 02 Y:2002 02 2002 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $14,245 $30,089 Implemented
UF0298 # 03 Y:2002 03 2002 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,874 $0 Not Implemented
UF0298 # 04 Y:2002 04 2002 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $912 $2,000 Not Implemented
UF0298 # 05 Y:2002 05 2002 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $6,811 $20,000 Not Implemented
UF0298 # 06 Y:2002 06 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,022 $1,000 Implemented
MI0036 # 01 Y:2002 01 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,880 $52 Implemented
MI0036 # 02 Y:2002 02 2002 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $929 $2 Not Implemented
MI0036 # 03 Y:2002 03 2002 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $9,623 $8 Not Implemented
MI0036 # 04 Y:2002 04 2002 MODIFY STORAGE SPACE TO AVOID RENTAL OF A WAREHOUSE $8,400 $995 Implemented
MI0036 # 05 Y:2002 05 2002 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $398 $250 Implemented
MI0036 # 06 Y:2002 06 2002 INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS $9,354 $6,035 Not Implemented
MI0036 # 07 Y:2002 07 2002 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $6,394 $9,000 Not Implemented
UF0297 # 01 Y:2002 01 2002 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $12,096 $7,584 Implemented
UF0297 # 02 Y:2002 02 2002 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $21,281 $33,167 Implemented