Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
6,055
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SF0050 # 04 Y:1995 | 04 | 1995 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $21,960 | $19,510 | Not Implemented |
SF0050 # 05 Y:1995 | 05 | 1995 | INSTALL / REPAIR INSULATION ON STEAM LINES | $1,254 | $748 | Not Implemented |
SF0050 # 06 Y:1995 | 06 | 1995 | REPAIR AND ELIMINATE STEAM LEAKS | $401 | $81 | Implemented |
SF0050 # 07 Y:1995 | 07 | 1995 | USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER | $4,773 | $25,000 | Not Implemented |
SF0050 # 08 Y:1995 | 08 | 1995 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,930 | $900 | Implemented |
SF0050 # 09 Y:1995 | 09 | 1995 | USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT | $478,218 | $653,645 | Not Implemented |
OD0022 # 01 Y:1995 | 01 | 1995 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $14,327 | $25,510 | Implemented |
OD0022 # 02 Y:1995 | 02 | 1995 | METER WASTE WATER | $6,284 | $1,521 | Implemented |
OD0022 # 03 Y:1995 | 03 | 1995 | MODERATE COOLING TOWER OUTLET TEMPERATURE | $3,379 | $0 | Not Implemented |
OD0022 # 04 Y:1995 | 04 | 1995 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $7,277 | $4,655 | Implemented |
OD0022 # 05 Y:1995 | 05 | 1995 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $4,120 | $4,008 | Implemented |
OD0022 # 06 Y:1995 | 06 | 1995 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $4,353 | $3,562 | Implemented |
OD0022 # 07 Y:1995 | 07 | 1995 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $1,807 | $400 | Implemented |
OK0463 # 01 Y:1995 | 01 | 1995 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $13,078 | $23,140 | Implemented |
OK0463 # 02 Y:1995 | 02 | 1995 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,020 | $3,000 | Implemented |
OK0463 # 03 Y:1995 | 03 | 1995 | UPGRADE CONTROLS ON COMPRESSORS | $4,172 | $2,500 | Not Implemented |
OK0463 # 04 Y:1995 | 04 | 1995 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $941 | $1,315 | Not Implemented |
OK0463 # 05 Y:1995 | 05 | 1995 | INSTALL / REPAIR INSULATION ON STEAM LINES | $3,357 | $1,535 | Implemented |
OK0463 # 06 Y:1995 | 06 | 1995 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,526 | $19,716 | Implemented |
OK0463 # 07 Y:1995 | 07 | 1995 | USE OTHER WASTE CONCENTRATION METHODS | $25,799 | $50,000 | Implemented |
MS0019 # 01 Y:1995 | 01 | 1995 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $5,016 | $10,000 | Not Implemented |
MS0019 # 02 Y:1995 | 02 | 1995 | OPTIMIZE PLANT POWER FACTOR | $5,174 | $3,750 | Implemented |
MS0019 # 03 Y:1995 | 03 | 1995 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,539 | $500 | Implemented |
MS0019 # 04 Y:1995 | 04 | 1995 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,429 | $1,436 | Implemented |
MS0019 # 05 Y:1995 | 05 | 1995 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $1,563 | $0 | Not Implemented |