IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

146,354

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MI0350 # 09 Y:2019 09 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $8,638 $200 Not Implemented
MI0350 # 10 Y:2019 10 2019 INCREASE EFFICIENCY OF TRUCKS $6,123 $5,800 Not Implemented
MI0350 # 11 Y:2019 11 2019 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $3,540 $6,160 Not Implemented
MI0350 # 12 Y:2019 12 2019 MAINTAIN AIR FILTERS BY CLEANING OR REPLACEMENT $2,203 $410 Implemented
MI0350 # 13 Y:2019 13 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,052 $80 Implemented
SU0479 # 01 Y:2019 01 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $733 $0 Implemented
SU0479 # 02 Y:2019 02 2019 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,486 $300 Implemented
SU0479 # 03 Y:2019 03 2019 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $1,267 $113 Not Implemented
SU0479 # 04 Y:2019 04 2019 INSULATE BARE EQUIPMENT $6,520 $500 Implemented
SU0479 # 05 Y:2019 05 2019 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $1,382 $383 Not Implemented
SU0479 # 06 Y:2019 06 2019 INSTALL / REPAIR INSULATION ON STEAM LINES $584 $500 Implemented
SU0479 # 07 Y:2019 07 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $453 $301 Not Implemented
SU0479 # 08 Y:2019 08 2019 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $423 $714 Not Implemented
IP0117 # 01 Y:2019 01 2019 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $1,422 $412 Implemented
IP0117 # 02 Y:2019 02 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,275 $9,350 Implemented
IP0117 # 03 Y:2019 03 2019 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $3,315 $17,500 Not Implemented
IP0117 # 04 Y:2019 04 2019 USE SOLAR HEAT TO MAKE ELECTRICTY $23,331 $134,106 Not Implemented
AM0777 # 01 Y:2019 01 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $11,772 $2,000 Implemented
AM0777 # 02 Y:2019 02 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,919 $890 Not Implemented
AM0777 # 03 Y:2019 03 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,252 $7,860 Not Implemented
AM0777 # 04 Y:2019 04 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,417 $9 Implemented
AM0777 # 05 Y:2019 05 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $982 $1,855 Implemented
AM0777 # 06 Y:2019 06 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $646 $191 Implemented
AM0777 # 07 Y:2019 07 2019 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $585 $0 Implemented
AM0777 # 08 Y:2019 08 2019 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $91 $36 Implemented