Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
1,011
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
DL0066 # 01 Y:2011 | 01 | 2011 | RECOVER WASTE HEAT FROM EQUIPMENT | $2,960 | $1,035 | Implemented |
DL0066 # 02 Y:2011 | 02 | 2011 | USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR | $101,455 | $36,300 | Not Implemented |
DL0066 # 03 Y:2011 | 03 | 2011 | CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS | $2,460 | $2,000 | Implemented |
DL0066 # 04 Y:2011 | 04 | 2011 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $9,015 | $4,000 | Implemented |
DL0066 # 05 Y:2011 | 05 | 2011 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,701 | $1,257 | Not Implemented |
DL0066 # 06 Y:2011 | 06 | 2011 | UPGRADE CONTROLS ON COMPRESSORS | $12,600 | $10,000 | Not Implemented |
DL0066 # 07 Y:2011 | 07 | 2011 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $2,163 | $3,750 | Not Implemented |
WV0410 # 01 Y:2010 | 01 | 2010 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $92,924 | $0 | Implemented |
WV0410 # 02 Y:2010 | 02 | 2010 | AIR CONDITION ONLY SPACE NECESSARY | $6,499 | $900 | Not Implemented |
WV0410 # 03 Y:2010 | 03 | 2010 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $3,551 | $2,200 | Implemented |
WV0410 # 04 Y:2010 | 04 | 2010 | IMPROVE LUBRICATION PRACTICES | $1,907 | $618 | Implemented |
WV0410 # 05 Y:2010 | 05 | 2010 | USE RADIANT HEATER FOR SPOT HEATING | $1,430 | $5,800 | Not Implemented |
WV0410 # 06 Y:2010 | 06 | 2010 | INSTALL OCCUPANCY SENSORS | $1,273 | $210 | Implemented |
WV0410 # 07 Y:2010 | 07 | 2010 | RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING | $1,222 | $3,100 | Not Implemented |
WV0410 # 08 Y:2010 | 08 | 2010 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $1,020 | $67 | Implemented |
WV0410 # 09 Y:2010 | 09 | 2010 | RECOVER WASTE HEAT FROM EQUIPMENT | $563 | $274 | Not Implemented |
WV0410 # 10 Y:2010 | 10 | 2010 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $200 | $20 | Implemented |
WV0410 # 11 Y:2010 | 11 | 2010 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $145 | $440 | Not Implemented |
DL0050 # 01 Y:2010 | 01 | 2010 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,623 | $100 | Not Implemented |
DL0050 # 02 Y:2010 | 02 | 2010 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,070 | $300 | Implemented |
DL0050 # 03 Y:2010 | 03 | 2010 | INSTALL SET-BACK TIMERS | $1,236 | $300 | Not Implemented |
DL0050 # 04 Y:2010 | 04 | 2010 | COVER OPEN TANKS | $263 | $275 | Not Implemented |
DL0050 # 05 Y:2010 | 05 | 2010 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $9,850 | $34,600 | Implemented |
WV0405 # 01 Y:2010 | 01 | 2010 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $10,129 | $42,755 | Implemented |
WV0405 # 02 Y:2010 | 02 | 2010 | USE RADIANT HEATER FOR SPOT HEATING | $8,114 | $4,540 | Implemented |