Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
9,942
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UD1046 # 05 Y:2022 | 05 | 2022 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,795 | $3,279 | Not Implemented |
UD1046 # 06 Y:2022 | 06 | 2022 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $30,166 | $0 | Implemented |
UD1046 # 07 Y:2022 | 07 | 2022 | RECOVER WASTE HEAT FROM EQUIPMENT | $12,615 | $1,500 | Not Implemented |
UD1046 # 08 Y:2022 | 08 | 2022 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $27,755 | $60,000 | Not Implemented |
UD1046 # 09 Y:2022 | 09 | 2022 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $35,495 | $1,200 | Not Implemented |
UD1046 # 10 Y:2022 | 10 | 2022 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $5,940 | $0 | Not Implemented |
UD1046 # 11 Y:2022 | 11 | 2022 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,765 | $4,001 | Not Implemented |
UD1046 # 12 Y:2022 | 12 | 2022 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $1,614 | $5,220 | Not Implemented |
UD1046 # 13 Y:2022 | 13 | 2022 | LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER | $127,137 | $75,000 | Implemented |
UD1046 # 14 Y:2022 | 14 | 2022 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $386,941 | $554,028 | Implemented |
UD1045 # 01 Y:2022 | 01 | 2022 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $5,883 | $0 | Not Implemented |
UD1045 # 02 Y:2022 | 02 | 2022 | COMBINE UTILITY METERS | $1,103 | $0 | Not Implemented |
UD1045 # 03 Y:2022 | 03 | 2022 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $21,090 | $27,500 | Not Implemented |
UD1045 # 04 Y:2022 | 04 | 2022 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $19,605 | $600 | Not Implemented |
UD1045 # 05 Y:2022 | 05 | 2022 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $11,284 | $453 | Not Implemented |
UD1045 # 06 Y:2022 | 06 | 2022 | RECOVER WASTE HEAT FROM EQUIPMENT | $720 | $1,000 | Not Implemented |
UD1045 # 07 Y:2022 | 07 | 2022 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $45,938 | $35,826 | Not Implemented |
UD1045 # 08 Y:2022 | 08 | 2022 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,184 | $2,200 | Not Implemented |
UD1045 # 09 Y:2022 | 09 | 2022 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $18,617 | $32,900 | Not Implemented |
UD1045 # 10 Y:2022 | 10 | 2022 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $3,319 | $15,000 | Not Implemented |
UD1044 # 01 Y:2022 | 01 | 2022 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $4,822 | $0 | Not Implemented |
UD1044 # 02 Y:2022 | 02 | 2022 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $704 | $0 | Not Implemented |
UD1044 # 03 Y:2022 | 03 | 2022 | REDUCE VENTILATION AIR | $6,187 | $750 | Not Implemented |
UD1044 # 04 Y:2022 | 04 | 2022 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $318 | $0 | Implemented |
UD1044 # 05 Y:2022 | 05 | 2022 | INSTALL OCCUPANCY SENSORS | $1,611 | $900 | Not Implemented |