Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
4,640
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
IA0282 # 06 Y:2001 | 06 | 2001 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $4,255 | $0 | Implemented |
IA0282 # 07 Y:2001 | 07 | 2001 | RECOVER WASTE HEAT FROM EQUIPMENT | $3,297 | $1,111 | Not Implemented |
IA0282 # 08 Y:2001 | 08 | 2001 | USE RADIANT HEATER FOR SPOT HEATING | $6,750 | $9,596 | Implemented |
IA0282 # 09 Y:2001 | 09 | 2001 | ELIMINATE OLD STOCK AND MODIFY INVENTORY CONTROL | $45,760 | $58,400 | n/a |
OR0399 # 01 Y:2001 | 01 | 2001 | OPTIMIZE PLANT POWER FACTOR | $11,030 | $9,500 | Not Implemented |
OR0399 # 02 Y:2001 | 02 | 2001 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $22,410 | $98,120 | Implemented |
OR0399 # 03 Y:2001 | 03 | 2001 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,926 | $4,000 | Not Implemented |
OR0399 # 04 Y:2001 | 04 | 2001 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $4,029 | $18,400 | Not Implemented |
OR0399 # 05 Y:2001 | 05 | 2001 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $1,390 | $6,063 | Not Implemented |
SU0111 # 01 Y:2001 | 01 | 2001 | PAY UTILITY BILLS ON TIME | $605 | $0 | Not Implemented |
SU0111 # 02 Y:2001 | 02 | 2001 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $210 | $0 | Implemented |
SU0111 # 03 Y:2001 | 03 | 2001 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $345 | $0 | Implemented |
SU0111 # 04 Y:2001 | 04 | 2001 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $1,383 | $2,500 | Not Implemented |
SU0111 # 05 Y:2001 | 05 | 2001 | TURN OFF EQUIPMENT WHEN NOT IN USE | $11,959 | $0 | Implemented |
SU0111 # 06 Y:2001 | 06 | 2001 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $358 | $60 | Not Implemented |
SU0111 # 07 Y:2001 | 07 | 2001 | RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS | $3,135 | $0 | Implemented |
TA0018 # 01 Y:2001 | 01 | 2001 | REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS | $3,925 | $0 | n/a |
TA0018 # 02 Y:2001 | 02 | 2001 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,620 | $1,400 | n/a |
TA0018 # 03 Y:2001 | 03 | 2001 | USE SYNTHETIC LUBRICANT | $1,460 | $0 | n/a |
TA0018 # 04 Y:2001 | 04 | 2001 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $1,070 | $0 | n/a |
TA0018 # 05 Y:2001 | 05 | 2001 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $700 | $0 | n/a |
TA0018 # 06 Y:2001 | 06 | 2001 | MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION | $645 | $0 | n/a |
TA0018 # 07 Y:2001 | 07 | 2001 | INSULATE BARE EQUIPMENT | $230 | $20 | n/a |
OR0398 # 01 Y:2001 | 01 | 2001 | INSTALL SENSORS TO DETECT DEFECTS | $1,495,000 | $2,000,000 | Not Implemented |
OR0398 # 02 Y:2001 | 02 | 2001 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $20,011 | $85,079 | Implemented |