IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,640

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IA0282 # 06 Y:2001 06 2001 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $4,255 $0 Implemented
IA0282 # 07 Y:2001 07 2001 RECOVER WASTE HEAT FROM EQUIPMENT $3,297 $1,111 Not Implemented
IA0282 # 08 Y:2001 08 2001 USE RADIANT HEATER FOR SPOT HEATING $6,750 $9,596 Implemented
IA0282 # 09 Y:2001 09 2001 ELIMINATE OLD STOCK AND MODIFY INVENTORY CONTROL $45,760 $58,400 n/a
OR0399 # 01 Y:2001 01 2001 OPTIMIZE PLANT POWER FACTOR $11,030 $9,500 Not Implemented
OR0399 # 02 Y:2001 02 2001 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $22,410 $98,120 Implemented
OR0399 # 03 Y:2001 03 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,926 $4,000 Not Implemented
OR0399 # 04 Y:2001 04 2001 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $4,029 $18,400 Not Implemented
OR0399 # 05 Y:2001 05 2001 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $1,390 $6,063 Not Implemented
SU0111 # 01 Y:2001 01 2001 PAY UTILITY BILLS ON TIME $605 $0 Not Implemented
SU0111 # 02 Y:2001 02 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $210 $0 Implemented
SU0111 # 03 Y:2001 03 2001 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $345 $0 Implemented
SU0111 # 04 Y:2001 04 2001 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $1,383 $2,500 Not Implemented
SU0111 # 05 Y:2001 05 2001 TURN OFF EQUIPMENT WHEN NOT IN USE $11,959 $0 Implemented
SU0111 # 06 Y:2001 06 2001 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $358 $60 Not Implemented
SU0111 # 07 Y:2001 07 2001 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS $3,135 $0 Implemented
TA0018 # 01 Y:2001 01 2001 REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS $3,925 $0 n/a
TA0018 # 02 Y:2001 02 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,620 $1,400 n/a
TA0018 # 03 Y:2001 03 2001 USE SYNTHETIC LUBRICANT $1,460 $0 n/a
TA0018 # 04 Y:2001 04 2001 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $1,070 $0 n/a
TA0018 # 05 Y:2001 05 2001 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $700 $0 n/a
TA0018 # 06 Y:2001 06 2001 MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION $645 $0 n/a
TA0018 # 07 Y:2001 07 2001 INSULATE BARE EQUIPMENT $230 $20 n/a
OR0398 # 01 Y:2001 01 2001 INSTALL SENSORS TO DETECT DEFECTS $1,495,000 $2,000,000 Not Implemented
OR0398 # 02 Y:2001 02 2001 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $20,011 $85,079 Implemented