IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,002

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NC0467 # 07 Y:2012 07 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $245 $100 Implemented
NC0467 # 08 Y:2012 08 2012 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $459 $300 Implemented
NC0467 # 09 Y:2012 09 2012 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $34,729 $15,000 Implemented
MI0230 # 01 Y:2012 01 2012 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $185,551 $480 Implemented
MI0230 # 02 Y:2012 02 2012 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $146,160 $70,200 Not Implemented
MI0230 # 03 Y:2012 03 2012 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $88,716 $46,097 Implemented
MI0230 # 04 Y:2012 04 2012 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $64,249 $12,488 Not Implemented
MI0230 # 05 Y:2012 05 2012 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $45,101 $41,600 Implemented
MI0230 # 06 Y:2012 06 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $17,707 $1,660 Implemented
MI0230 # 07 Y:2012 07 2012 INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE $15,150 $4,720 Not Implemented
MI0230 # 08 Y:2012 08 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $10,512 $1,040 Implemented
MI0230 # 09 Y:2012 09 2012 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $8,652 $6,802 Not Implemented
MI0230 # 10 Y:2012 10 2012 INSTALL / REPAIR INSULATION ON STEAM LINES $7,962 $1,589 Implemented
MI0230 # 11 Y:2012 11 2012 INSTALL / REPAIR INSULATION ON STEAM LINES $7,581 $3,569 Not Implemented
MI0230 # 12 Y:2012 12 2012 INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE $6,487 $2,848 Implemented
MI0230 # 13 Y:2012 13 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,524 $80 Not Implemented
MI0230 # 14 Y:2012 14 2012 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $4,550 $40 Implemented
MI0230 # 15 Y:2012 15 2012 INSTALL OCCUPANCY SENSORS $2,794 $320 Implemented
MI0230 # 16 Y:2012 16 2012 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,194 $3,160 Not Implemented
MZ0099 # 01 Y:2012 01 2012 INSTALL DIRECT ACTING UNITS IN PLACE OF COMPRESSED AIR PRESSURE SYSTEM IN SAFETY SYSTEM $43,935 $92,930 Implemented
MZ0099 # 02 Y:2012 02 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,582 $33,200 Implemented
MZ0099 # 03 Y:2012 03 2012 INSTALL OCCUPANCY SENSORS $2,144 $2,080 Implemented
MZ0099 # 04 Y:2012 04 2012 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,358 $940 Implemented
MZ0099 # 05 Y:2012 05 2012 USE HEAT IN FLUE GASES TO PREHEAT PRODUCTS OR MATERIALS $3,108 $22,500 Implemented
MA0702 # 01 Y:2012 01 2012 REDUCE FLUID FLOW RATES $11,375 $9,400 Implemented