IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

160,855

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NT0012 # 01 Y:2023 01 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,463 $4,553 Not Implemented
NT0012 # 02 Y:2023 02 2023 OPTIMIZE PLANT POWER FACTOR $4,568 $1,441 Not Implemented
NT0012 # 03 Y:2023 03 2023 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $315 $200 Not Implemented
NT0012 # 04 Y:2023 04 2023 REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS $13,612 $0 Not Implemented
NT0012 # 05 Y:2023 05 2023 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $335 $0 Not Implemented
NT0012 # 06 Y:2023 06 2023 REDUCE SCRAP PRODUCTION $80,000 $20,000 Not Implemented
IC0288 # 01 Y:2023 01 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,774 $1,526 Not Implemented
IC0288 # 02 Y:2023 02 2023 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $137 $78 Implemented
IC0288 # 03 Y:2023 03 2023 PURCHASE EQUIPMENT INSTEAD OF LEASING $77,000 $112,794 Not Implemented
IC0288 # 04 Y:2023 04 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $86,169 $883,093 Not Implemented
IC0288 # 05 Y:2023 05 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,633 $4,136 Implemented
IC0288 # 06 Y:2023 06 2023 INSTALL / REPAIR INSULATION ON STEAM LINES $592 $496 Implemented
IC0288 # 07 Y:2023 07 2023 INSTALL STORM WINDOWS AND DOORS $2,632 $32,631 Not Implemented
TT0299 # 01 Y:2023 01 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $20,478 $8,003 n/a
TT0299 # 02 Y:2023 02 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $9,312 $22,135 n/a
TT0299 # 03 Y:2023 03 2023 RECOVER WASTE HEAT FROM EQUIPMENT $2,097 $30 n/a
TT0299 # 04 Y:2023 04 2023 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,491 $40 n/a
TT0299 # 05 Y:2023 05 2023 REDUCE HEAT GAIN BY WINDOW TINTING $809 $3,500 n/a
TT0299 # 06 Y:2023 06 2023 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $632 $750 n/a
TT0299 # 07 Y:2023 07 2023 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $387 $100 n/a
TT0299 # 08 Y:2023 08 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $221 $90 n/a
DL0225 # 01 Y:2023 01 2023 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $6,327 $0 Implemented
DL0225 # 02 Y:2023 02 2023 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $6,327 $0 Implemented
DL0225 # 03 Y:2023 03 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,072 $500 Implemented
DL0225 # 04 Y:2023 04 2023 SUBSTITUTE COMPRESSED AIR COOLING WITH WATER OR AIR COOLING $15,801 $4,102 Not Implemented