Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
7,769
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UF0294 # 10 Y:2002 | 10 | 2002 | REPLACE OLD MACHINE WITH NEW AUTOMATIC MULTI-STATION TOOL | $8,320 | $32,000 | Implemented |
UF0294 # 11 Y:2002 | 11 | 2002 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $2,880 | $13,500 | Not Implemented |
MI0029 # 01 Y:2002 | 01 | 2002 | METER WASTE WATER | $73,069 | $3,650 | Not Implemented |
MI0029 # 02 Y:2002 | 02 | 2002 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $55,380 | $42,432 | Not Implemented |
MI0029 # 03 Y:2002 | 03 | 2002 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $19,287 | $1,550 | Implemented |
MI0029 # 04 Y:2002 | 04 | 2002 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $15,657 | $2,122 | Implemented |
MI0029 # 05 Y:2002 | 05 | 2002 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $10,668 | $3 | Implemented |
MI0028 # 01 Y:2002 | 01 | 2002 | CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS | $61,673 | $3,000 | n/a |
MI0028 # 02 Y:2002 | 02 | 2002 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $15,305 | $930 | n/a |
MI0028 # 03 Y:2002 | 03 | 2002 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $8,032 | $255 | n/a |
MI0028 # 04 Y:2002 | 04 | 2002 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $7,051 | $8 | n/a |
MI0028 # 05 Y:2002 | 05 | 2002 | RECYCLE WHITE WATER | $5,465 | $601 | n/a |
MI0028 # 06 Y:2002 | 06 | 2002 | COVER OPEN TANKS | $149 | $48 | n/a |
MI0027 # 01 Y:2002 | 01 | 2002 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $4,448 | $1,859 | Implemented |
MI0027 # 02 Y:2002 | 02 | 2002 | INSTALL OR UPGRADE INSULATION ON HVAC DISTRIBUTION SYSTEMS | $1,410 | $2,000 | Not Implemented |
MI0027 # 03 Y:2002 | 03 | 2002 | MODIFY STARTUP/SHUTDOWN TIMES | $150,000 | $3,900 | Implemented |
MI0027 # 04 Y:2002 | 04 | 2002 | RECYCLE WHITE WATER | $2,639 | $982 | Not Implemented |
MI0027 # 05 Y:2002 | 05 | 2002 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $6,727 | $1,250 | Not Implemented |
UF0290 # 01 Y:2002 | 01 | 2002 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $19,693 | $20,165 | Not Implemented |
UF0290 # 02 Y:2002 | 02 | 2002 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $35,297 | $71,595 | Not Implemented |
UF0290 # 03 Y:2002 | 03 | 2002 | USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT | $864,295 | $3,600,000 | Not Implemented |
UF0290 # 04 Y:2002 | 04 | 2002 | REPAIR FURNACES AND OVEN DOORS SO THAT THEY SEAL EFFICIENTLY | $18,405 | $33,700 | Not Implemented |
UF0290 # 05 Y:2002 | 05 | 2002 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $5,807 | $0 | Not Implemented |
UF0290 # 06 Y:2002 | 06 | 2002 | USE OPTIMUM TEMPERATURE | $234,181 | $2,080 | Not Implemented |
UF0290 # 07 Y:2002 | 07 | 2002 | USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING | $3,259 | $1,633 | Not Implemented |