IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,333

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
HO0222 # 05 Y:2000 05 2000 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $723 $4,000 Implemented
HO0222 # 06 Y:2000 06 2000 USE DEMAND CONTROLLER OR LOAD SHEDDER $16,014 $2,700 Not Implemented
HO0222 # 07 Y:2000 07 2000 ELIMINATE OLD STOCK AND MODIFY INVENTORY CONTROL $7,500 $5,000 Not Implemented
HO0222 # 08 Y:2000 08 2000 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $30,000 $4,000 Implemented
HO0222 # 09 Y:2000 09 2000 RECYCLE CASTING SAND $5,475 $500 Implemented
HO0222 # 10 Y:2000 10 2000 METER WASTE WATER $902 $0 Implemented
DS0151 # 01 Y:2000 01 2000 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $4,672 $192 Implemented
DS0151 # 02 Y:2000 02 2000 ADOPT IN-HOUSE MATERIAL GENERATION $8,245 $4,500 Not Implemented
DS0151 # 03 Y:2000 03 2000 APPLY FOR INVESTMENT INCENTIVES $709 $400 Implemented
HO0221 # 01 Y:2000 01 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,602 $27,210 Not Implemented
HO0221 # 02 Y:2000 02 2000 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $554 $200 Implemented
HO0221 # 03 Y:2000 03 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,110 $7,590 Implemented
HO0221 # 04 Y:2000 04 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $415 $0 Not Implemented
HO0221 # 05 Y:2000 05 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,721 $600 Implemented
HO0221 # 06 Y:2000 06 2000 USE DOUBLE OR TRIPLE GLAZED WINDOWS TO MAINTAIN HIGHER RELATIVE HUMIDITY AND TO REDUCE HEAT LOSSES $2,845 $9,720 Implemented
HO0221 # 07 Y:2000 07 2000 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT $1,176 $360 Not Implemented
HO0221 # 08 Y:2000 08 2000 IMPROVE SPACE COMFORT CONDITIONING $8,211 $1,160 Not Implemented
HO0221 # 09 Y:2000 09 2000 IMPROVE SPACE COMFORT CONDITIONING $1,200 $1,800 Not Implemented
HO0221 # 10 Y:2000 10 2000 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $900 $60 Implemented
AM0361 # 01 Y:2000 01 2000 INSTALL AUTOMATIC PACKING EQUIPMENT $576,720 $201,440 n/a
AM0361 # 02 Y:2000 02 2000 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $30,000 $2,905 n/a
AM0361 # 03 Y:2000 03 2000 OPTIMIZE PLANT POWER FACTOR $20,600 $41,200 n/a
AM0361 # 04 Y:2000 04 2000 DISCONNECT BALLASTS $4,920 $600 n/a
AM0361 # 05 Y:2000 05 2000 PAY BILLS ON TIME TO AVOID LATE FEES $4,274 $0 n/a
AM0361 # 06 Y:2000 06 2000 DISCONNECT BALLASTS $1,930 $300 n/a