Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
7,769
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UF0290 # 08 Y:2002 | 08 | 2002 | REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC | $1,947 | $2,300 | Not Implemented |
UF0290 # 09 Y:2002 | 09 | 2002 | USE TANKS WITH A CONICAL BOTTOM OUTLET SECTION TO REDUCE WASTE ASSOCIATED WITH THE INTERFACE OF TWO LIQUIDS | $17,094 | $0 | Not Implemented |
UF0290 # 10 Y:2002 | 10 | 2002 | SEPARATE AND RECYCLE SCRAP METAL TO FOUNDRY OR FOR SALE | $174,200 | $0 | Not Implemented |
UF0290 # 11 Y:2002 | 11 | 2002 | INSTALL REFRIGERATION SYSTEM TO COOL PRODUCT | $138,643 | $29,000 | Not Implemented |
UF0293 # 01 Y:2002 | 01 | 2002 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $20,692 | $12,162 | n/a |
UF0293 # 02 Y:2002 | 02 | 2002 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $24,940 | $30,000 | n/a |
UF0293 # 03 Y:2002 | 03 | 2002 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $34,684 | $23,130 | n/a |
UF0293 # 04 Y:2002 | 04 | 2002 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,852 | $550 | n/a |
UF0293 # 05 Y:2002 | 05 | 2002 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $2,029 | $3,500 | n/a |
UF0293 # 06 Y:2002 | 06 | 2002 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,444 | $4,753 | n/a |
UF0293 # 07 Y:2002 | 07 | 2002 | MOVE BOILER TO MORE EFFICIENT LOCATION | $1,449 | $0 | n/a |
UF0293 # 08 Y:2002 | 08 | 2002 | UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT | $11,069 | $50,413 | n/a |
UF0293 # 09 Y:2002 | 09 | 2002 | INSTALL OCCUPANCY SENSORS | $3,373 | $828 | n/a |
UF0293 # 10 Y:2002 | 10 | 2002 | RECOVER AND REUSE WASTE MATERIAL | $83,104 | $400,000 | n/a |
UF0293 # 11 Y:2002 | 11 | 2002 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $642 | $1,895 | n/a |
UF0293 # 12 Y:2002 | 12 | 2002 | METER WASTE WATER | $5,209 | $1,700 | n/a |
UF0293 # 13 Y:2002 | 13 | 2002 | EXPAND OPERATIONS INTO UNUSED SPACE | $40,000 | $4,838 | n/a |
UF0293 # 14 Y:2002 | 14 | 2002 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $133,295 | $97,500 | n/a |
UF0293 # 15 Y:2002 | 15 | 2002 | CHANGE OPERATING CONDITIONS | $4,941 | $5,000 | n/a |
UF0293 # 16 Y:2002 | 16 | 2002 | INSTALL AUTOMATIC PART STORAGE / RETREVAL SYSTEM | $2,808 | $864 | n/a |
UF0293 # 17 Y:2002 | 17 | 2002 | RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS | $10,000 | $752 | n/a |
MI0026 # 01 Y:2002 | 01 | 2002 | REPLACE OLD MACHINE WITH NEW AUTOMATIC MULTI-STATION TOOL | $26,325 | $45,000 | Not Implemented |
MI0026 # 02 Y:2002 | 02 | 2002 | CONDENSE OPERATION INTO ONE BUILDING | $23,625 | $714 | Implemented |
MI0026 # 03 Y:2002 | 03 | 2002 | OPTIMIZE LOT SIZES TO REDUCE INVENTORY CARRYING COSTS | $16,250 | $60 | Implemented |
MI0026 # 04 Y:2002 | 04 | 2002 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,497 | $60 | Implemented |