IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,474

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0017 # 05 Y:1994 05 1994 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $454 $140 Not Implemented
WV0017 # 06 Y:1994 06 1994 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $274 $25 Not Implemented
WV0017 # 07 Y:1994 07 1994 USE SYNTHETIC LUBRICANT $652 $0 Implemented
WV0017 # 08 Y:1994 08 1994 DIRECT WARMEST AIR TO COMBUSTION INTAKE $497 $960 Not Implemented
WV0017 # 09 Y:1994 09 1994 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,620 $200 Implemented
UF0079 # 01 Y:1994 01 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,254 $1,557 Implemented
UF0079 # 02 Y:1994 02 1994 INSTALL SPECTRAL REFLECTORS / DELAMP $924 $1,088 Implemented
UF0079 # 03 Y:1994 03 1994 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $279 $0 Not Implemented
UF0079 # 04 Y:1994 04 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $362 $360 Not Implemented
UF0079 # 05 Y:1994 05 1994 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $813 $1,902 Not Implemented
UF0079 # 06 Y:1994 06 1994 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $1,331 $0 Implemented
NC0016 # 01 Y:1994 01 1994 INSTALL TURBULATORS $68,797 $3,000 Not Implemented
NC0016 # 02 Y:1994 02 1994 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $11,812 $15,750 Not Implemented
NC0016 # 03 Y:1994 03 1994 USE WASTE HEAT TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR $5,634 $38,500 Not Implemented
NC0016 # 04 Y:1994 04 1994 RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING $42,728 $34,300 Not Implemented
NC0016 # 05 Y:1994 05 1994 USE OPTIMUM THICKNESS INSULATION $61,266 $133,293 Not Implemented
NC0016 # 06 Y:1994 06 1994 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,603 $1,000 Not Implemented
NC0016 # 07 Y:1994 07 1994 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,831 $960 Implemented
NC0016 # 08 Y:1994 08 1994 BURN A LESS EXPENSIVE GRADE OF FUEL $40,563 $118,090 Not Implemented
MA0295 # 01 Y:1994 01 1994 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,966 $50 Implemented
MA0295 # 02 Y:1994 02 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,024 $62 Not Implemented
MA0295 # 03 Y:1994 03 1994 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $1,077 $475 Implemented
MA0295 # 04 Y:1994 04 1994 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $205 $0 Not Implemented
MA0295 # 05 Y:1994 05 1994 INSTALL OCCUPANCY SENSORS $123 $109 Not Implemented
AM0198 # 01 Y:1994 01 1994 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $18,000 $7,434 Implemented